| Location: | Kansas |
|---|---|
| Posted: | Sep 9, 2026 |
| Due: | Sep 29, 2026 |
| Agency: | City of Derby |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2026-021 |
| Publication URL: | To access bid details, please log in. |
| Bid Number: |
2026-021
|
| Bid Title: |
Water Treatment Plant Pipelines
|
| Category: | Water, Sewer & Stormwater Construction |
| Status: | Open |
|
| ITEM NO. | DESCRIPTION | QUANTITY | UNIT |
|---|---|---|---|
| OFFSITE SOUTH PIPELINES | |||
| 1 | 16" WL Pipe | 7,426 | LF |
| 2 | 16" WL Pipe, RJ | 965 | LF |
| 3 | 16" RJ Pipe by Directional Drill | 1,493 | LF |
| 4 | Steel Casing by Trenchless Methods (Min ID 26") | 336 | LF |
| 5 | 16" Raw WL Pipe | 1,238 | LF |
| 6 | 16" Raw WL Pipe, RJ | 92 | LF |
| 7 | 16" Raw WL RJ Pipe by Directional Drill | 50 | LF |
| 8 | 10" Raw WL Pipe | 679 | LF |
| 9 | 10" SS FM Pipe | 7,489 | LF |
| 10 | 10" SS FM Pipe, RJ | 67 | LF |
| 11 | 10" SS FM RJ Pipe by Directional Drill | 1,604 | LF |
| 12 | Steel Casing by Trenchless Methods (Min ID 20") | 50 | LF |
| 13 | 12" SS Pipe | 24 | LF |
| 14 | WL , Connect to Existing | 4 | EA |
| 15 | SS FM, Connect to Existing | 1 | EA |
| 16 | MH, Connect to Existing | 1 | EA |
| 17 | 16" Valve Assembly | 3 | EA |
| 18 | 16" Valve Assembly, Anchored | 1 | EA |
| 19 | 10" Valve Assembly | 1 | EA |
| 20 | Flushing Hydrant Assembly | 8 | EA |
| 21 | Air Release Assembly | 5 | EA |
| 22 | Air Release Assembly with Bollards | 3 | EA |
| 23 | 6' Privacy Fence and Gate w/ Bollards | 1 | EA |
| 24 | Valve Vault | 1 | EA |
| 25 | Air Gap MH | 1 | EA |
| 26 | Existing MH, Adjust Top | 1 | EA |
| 27 | Remove and Replace Gravel Drive | 265 | LF |
| 28 | Fiber Conduit | 1 | LS |
| ITEM |
|---|
| NO. |
ADVERTISEMENT FOR BIDS
BID NO.: 2026-021
OWNER: CITY OF DERBY, KANSAS
ADDRESS: 611 N. MULBERRY, SUITE 300, DERBY, KANSAS 67037
Separate sealed BIDS for the construction of WATER TREATMENT PLANT PIPELINES, DERBY, SEDGWICK
COUNTY, KANSAS will be received by the City of Derby at Derby City Hall, 611 N. Mulberry, Suite 300 Derby,
Kansas 67037 until 2:00 p.m., Tuesday, September 29, 2026 and then at said office will be publicly opened and
read aloud. The project is briefly described as follows:
ITEM
DESCRIPTION QUANTITY UNIT
NO.
OFFSITE SOUTH PIPELINES
1 16" WL Pipe 7,426 LF
2 16" WL Pipe, RJ 965 LF
3 16" RJ Pipe by Directional Drill 1,493 LF
4 Steel Casing by Trenchless Methods (Min ID 26") 336 LF
5 16" Raw WL Pipe 1,238 LF
6 16" Raw WL Pipe, RJ 92 LF
7 16" Raw WL RJ Pipe by Directional Drill 50 LF
8 10" Raw WL Pipe 679 LF
9 10" SS FM Pipe 7,489 LF
10 10" SS FM Pipe, RJ 67 LF
11 10" SS FM RJ Pipe by Directional Drill 1,604 LF
12 Steel Casing by Trenchless Methods (Min ID 20") 50 LF
13 12" SS Pipe 24 LF
14 WL , Connect to Existing 4 EA
15 SS FM, Connect to Existing 1 EA
16 MH, Connect to Existing 1 EA
17 16" Valve Assembly 3 EA
18 16" Valve Assembly, Anchored 1 EA
19 10" Valve Assembly 1 EA
20 Flushing Hydrant Assembly 8 EA
21 Air Release Assembly 5 EA
22 Air Release Assembly with Bollards 3 EA
23 6' Privacy Fence and Gate w/ Bollards 1 EA
24 Valve Vault 1 EA
25 Air Gap MH 1 EA
26 Existing MH, Adjust Top 1 EA
27 Remove and Replace Gravel Drive 265 LF
28 Fiber Conduit 1 LS
00011 - 1
Rev. 09/2025
| OFFSITE NORTH PIPELINES | |||||
|---|---|---|---|---|---|
| 1 | 16" WL Pipe | 10,973 | LF | ||
| 2 | 16" WL Pipe RJ | 1,705 | LF | ||
| 3 | 16" WL Pipe RJ by Directional Drill | 2,325 | LF | ||
| 4 | Steel Casing by Trenchless Methods (Min ID 26") | 35 | LF | ||
| 5 | Steel Casing by Boriing / Jacking (Min ID 26") | 371 | LF | ||
| 6 | Flushing Hydrant Assembly | 10 | EA | ||
| 7 | Air Release Assembly | 6 | EA | ||
| 8 | Fire Hydrant Assembly | 1 | EA | ||
| 9 | 16" Valve Assembly | 6 | EA | ||
| 10 | Levee Crossing | 3 | EA | ||
| 11 | 24" X 16" Tapping Sleeve and Valve | 1 | EA | ||
| 12 | Eclipse #24 Sample Station | 1 | EA | ||
| 12 | |||||
| OFFSITE PIPELINES - LUMP SUM VALUES | |||||
| 1 | Site Clearing and Restoration | 1 | LS | ||
| 2 | Temporary and Permanent Seeding | 1 | LS | ||
| 3 | Erosion Control | 1 | LS |
OFFSITE NORTH PIPELINES
1 16" WL Pipe 10,973 LF
2 16" WL Pipe RJ 1,705 LF
3 16" WL Pipe RJ by Directional Drill 2,325 LF
4 Steel Casing by Trenchless Methods (Min ID 26") 35 LF
5 Steel Casing by Boriing / Jacking (Min ID 26") 371 LF
6 Flushing Hydrant Assembly 10 EA
7 Air Release Assembly 6 EA
8 Fire Hydrant Assembly 1 EA
9 16" Valve Assembly 6 EA
10 Levee Crossing 3 EA
11 24" X 16" Tapping Sleeve and Valve 1 EA
12 Eclipse #24 Sample Station 1 EA
OFFSITE PIPELINES - LUMP SUM VALUES
1 Site Clearing and Restoration 1 LS
2 Temporary and Permanent Seeding 1 LS
3 Erosion Control 1 LS
The CONTRACT DOCUMENTS MAY BE EXAMINED AT THE FOLLOWING LOCATIONS:
Derby City Hall, 611 N. Mulberry, Suite 300, Derby, Kansas 67037
Questions or clarifications regarding the bid documents should be directed to Ky Louanghaksaphone at Ext. 1255
or emailed to kylouanghaksaphone@derbyks.gov
Engineering Design Firm & Contract Documents: Professional Engineering Consultants, Gage Scheer,
316-262-2691; gage.scheer@pec1.com
Nondiscrimination in Employment
Bidders on this work will be required to comply with the President's Executive Order No. 11246. Requirements for
bidders and contractors under this order are explained in the specifications.
Proposals must be accompanied by a certified or cashier's check, or bid bond is acceptable to the City in an
amount not less than five percent (5%) of the proposal. Checks are to be made payable to the City of Derby and
drawn on a solvent Kansas Bank or Trust Company. These checks or bonds are to be retained by the City Clerk
until the contract for the project shall have been awarded.
_________________________________ ________________________
Kiel Mangus, City Manager DATE
00011 - 2
Rev. 09/2025

With GovernmentContracts, you can:
...and specifications for: 2025 Water Treatment Plant Capital Improvements Part A: Filter Valves ...
City of Manhattan
Bid Due: 10/28/2026