| Location: | Pennsylvania |
|---|---|
| Posted: | Apr 3, 2025 |
| Due: | Apr 23, 2025 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Horsham Water and Sewer Authority, Montgomery County |
| Publication URL: | To access bid details, please log in. |
Project Description: The Work to be done under this contract consists of all labor, equipment, and materials to clean, perform CCTV inspection, and complete repair work on the sanitary sewer system as described in the Specifications. The Work includes traffic control and bypass pumping as needed.
During rainfall events, there is the presence of water outside the pipe creating hydrostatic pressure on the pipe which will push water into the pipe if there are cracks and/or defects. These defects may not be noticeable in dry conditions; therefore, the contractor shall mobilize to the site at the next significant rain event (> 0.50” of rain in 24 hours) as directed or within 72 hours of notice to mobilize for the work.

With GovernmentContracts, you can:
...GUIDANCE AND OPERATIONAL CCTV SYSTEMS - PHASE 2 Bid Opening Date: 06/25/2026 11:00:00 ...
City of Philadelphia
Bid Due: 6/25/2026
...PW BID 6710ELB PHL- 1702.25 AUTOMATED PARKING GUIDANCE AND OPERATIONAL CCTV SYSTEMS - ...
City of Philadelphia
Bid Due: 6/25/2026
...sewer pipe along Bell Tavern Boulevard utilizing cured-in-place pipe (CIPP) lining systems..., including ...
PennBid
Bid Due: 6/11/2026
...the Hazelwood neighborhood of Pittsburgh Water's public sewer system. Work shall include; CCTV...
Pittsburgh Water & Sewer Authority
Bid Due: 6/25/2026