PROJECT MANUAL
FOR
CITY OF LYNCHBURG
Oak Lane and Hillview Drive Water Line Replacement
Invitation for Bid # 2027-017
Due: 3:00 PM, October 1, 2026
PROCUREMENT DIVISION
3RD FLOOR CITY HALL
900 CHURCH STREET
LYNCHBURG, VA 24504
TELEPHONE (434) 455-3970
Issued on: August 20, 2026
Table of Contents
Document Page #
Bidding Requirements
Advertisement For Bids .................................................................................................... 3
Bid Form ............................................................................................................................ 4
Escrow Account Election................................................................................................... 8
Equal Opportunity Report Statement .............................................................................. 9
Statement Of Experience ................................................................................................ 10
Statement Of Available Resources ................................................................................. 11
Corporate Status Form ................................................................................................... 12
Questions To Bidders/Offerors ...................................................................................... 13
Construction Agreement ................................................................................................ 14
City Of Lynchburg, Virginia Standard Performance Bond ............................................. 16
City Of Lynchburg Standard Labor And Material Payment Bond ................................. 18
Escrow Agreement .......................................................................................................... 21
Instructions To Bidders ................................................................................................... 25
General Conditions ......................................................................................................... 31
Supplemental Measurement and Payment ................................................................... 93
Attachments:
Oak Lane Project Drawings dated April 22, 2026 and Hillview Drive Project Drawings dated
June 10, 2026
PM - 2
| Sealed bids for the Oak Lane and Hillview Drive Water Line Replacement will be received by the City of | |||
|---|---|---|---|
| Lynchburg, Procurement Division, 3rd Floor City Hall, 900 Church Street, Lynchburg, VA 24504, until 3:00 PM, | |||
| October 1, 2026 | , and then publicly opened and read aloud in the First Floor Customer Conference Room located | ||
| in the City Hall lobby and broadcast via Microsoft Teams video conference. The Teams meeting link to the bid | |||
| opening will be posted to the City's Bid webpage: | https://www.lynchburgva.gov/Bids.aspx. | ||
ADVERTISEMENT FOR BIDS
Sealed bids for the Oak Lane and Hillview Drive Water Line Replacement will be received by the City of
Lynchburg, Procurement Division, 3rd Floor City Hall, 900 Church Street, Lynchburg, VA 24504, until 3:00 PM,
October 1, 2026, and then publicly opened and read aloud in the First Floor Customer Conference Room located
in the City Hall lobby and broadcast via Microsoft Teams video conference. The Teams meeting link to the bid
opening will be posted to the City's Bid webpage: https://www.lynchburgva.gov/Bids.aspx.
Mailed or Hand Delivered Bids: FedEx, UPS, and the USPS have access to the building to deliver mail/packages to
the Procurement Office. If vendors choose to hand deliver bids, they can do so at the Citizens First Information
Center in the lobby on the First Floor of City Hall at 900 Church St. Monday - Friday from 8:30 a.m. to 5:00 p.m.
A Procurement Office staff member will be contacted by Citizens First to retrieve the bid and timestamp it at
that time. It is the sole responsibility for the Bidder to ensure their bid is timestamped prior to the deadline for
submission. Please allow additional time to ensure this is done.
Online Bid Submission: To submit a bid online, go to www.lynchburgva.gov/Bids.aspx and click on the link to
open this specific solicitation. Click on the Submit Online button, complete the form, and upload your bid. Please
upload your bid as ONE file. As always, late bids will not be considered.
Project Description: The project consists of replacement of aging and undersized water mains on Oak Lane,
Fairway Place, Hillview Drive, and Valorie Court with new 8"/6" ductile iron pipe. Total length of water main to
be replaced is approximately 3210 linear feet. Following utility construction, the streets will repaired with trench
patching and pavement striping restored as needed.
Bid Documents may be viewed and printed directly from the City's website:
https://www.lynchburgva.gov/Bids.aspx.
An Optional, Virtual, Pre-Bid Conference will be held at 3:00 PM, August 27, 2026. The conference link is listed
on the City's website at: http://www.lynchburgva.gov/bids.aspx.
All requests for clarification of or questions regarding this Advertisement for Bids or for additional information
must be made in writing to Will Ruberry at william.ruberry@lynchburgva.gov and received by 3:00 PM,
September 23, 2026. All addenda should be signed and accompany any bid submitted.
There will be a "Live Bid Opening" link on the City's website at: www.lynchburgva.gov/Bids.aspx so that the
public can observe the proceedings. The bid results will be posted on the City's Bids website after award is
made.
PM - 3
BID FORM
Will Ruberry, CPPB
Procurement Division
City of Lynchburg
Third Floor, City Hall
900 Church Street
Lynchburg, Virginia 24504
Dear Mr. Ruberry,
The undersigned, as bidder, hereby declares that the only persons interested in this bid as principal, or
principals, is or are named herein and that no person other than herein mentioned has any interest in this bid or
in the Construction Agreement to be entered into; that this bid is made without connection with any other
person, company, or parties making a bid; and that it is in all respects fair and in good faith, without collusion or
fraud.
The undersigned, having visited and examined the site and having carefully studied all the Contract Documents,
including without limitation, all drawings and specifications pertaining to Oak Lane and Hillview Drive Water
Line Replacement for the City of Lynchburg, Virginia, hereby proposes to furnish all labor, equipment, materials,
and services and to perform all operations necessary to execute and complete the Work required for the
project, in strict accordance with the Contract Documents, The City of Lynchburg Manual of Specifications and
Standard Details, latest edition, and , together with Addenda numbered through ______ issued during
bidding period and hereby acknowledged, subject to the terms and conditions of the Construction Agreement
for the sum of
TOTAL BASE BID:
DOLLARS
($ ), which shall be referred to hereinafter as the Base Bid.
It is understood and agreed that the Owner, in protecting its best interests, reserves the right to reject any or all
bids or waive any defects. Any changes, erasures, modifications, deletions in the bid form, or alternate proposals
not specified in the Advertisement for Bids may make the bid irregular and subject to rejection.
Contractors will indicate a unit price for each item listed below. If the Construction Agreement is for a lump sum
price, unless clearly and specifically indicated otherwise in the Contract Documents, all unit prices only apply to
changes in the Work. The listed bid items are to contain all necessary costs required for completion of the Work
in accordance with the Contract Documents.
If the Construction Agreement is for unit prices and not for a lump sum price, it is understood that all quantities
listed on the following pages are estimated quantities, and the Owner reserves the right to raise, lower, or
eliminate any quantity or item, and in any case, the unit prices shall be used in determining partial and final
payment. It is further understood that costs to cover all components of the Work as described in the Contract
Documents are included in this bid, even in cases where specific line items are not identified.
We are properly equipped to execute all work of the character and extent required by the Contract Documents,
and we will enter into the Construction Agreement for the execution and completion of the Work in accordance
with the Contract Documents; and we further agree that, if awarded the Construction Agreement, we will
commence the Work on the date stated in the "Notice to Proceed" and will maintain a work force large enough
to execute the Work and all obligations no later than the completion date stated in the Contract Documents.
PM - 4
Enclosed herewith is the following Security, offered as assurance that the undersigned will enter into the
Construction Agreement for the execution and completion of the Work in accordance with the Contract
Documents:
Bidder's Certified Check issued by (name of bank) in the amount
of: $ (5% of Base Bid amount)
Bidder's Bid Bond for 5% of Base Bid Amount Issued by (name
of surety authorized to do business in Virginia).
The undersigned hereby agrees, if awarded the Construction Agreement, to execute and deliver to the City
within ten (10) days after his receipt of the Notice of Award, a performance bond and a payment bond, in forms
satisfactory to the City, from sureties authorized to do business in Virginia satisfactory to the City, in the amount
of one hundred (100) percent of the Base Bid.
The undersigned further agrees that, in case of failure on his part to execute the said Construction Agreement
within the ten (10) days after written notice being given on the award of the Construction Agreement or the
failure to deliver the required performance and payment bonds within the ten (10) days, the monies payable by
the Security accompanying this bid shall be paid to the City of Lynchburg, Virginia, as liquidated damages for
such failure; otherwise the Security accompanying this Bid shall be returned to the undersigned.
Attached herewith are completed Statement of Experience and Statement of Resources forms which include the
information requested.
The undersigned further certifies that this bid is not the result of, or affected by, any act of collusion with
another person engaged in the same line of business, or any act punishable under the Virginia Governmental
Frauds Act, or other law. This bid remains valid and may not be withdrawn for a period of 60 days from this date.
CURRENT VIRGINIA CONTRACTOR'S LICENSE/ REGISTRATION NO.:
Respectfully submitted,
CONTRACTOR
DATE
ADDRESS
Email
BY:
(Signature)
(Type/Print)
ITS:
(Title)
PM - 5
| 2027-017 Oak Lane and Hillview Drive Water Line Replacement Bid Form | |||||
|---|---|---|---|---|---|
| Oak Lane/Fairway Place | |||||
| ITEM # | ITEM DESCRIPTION | QTY | UNIT COST | TOTAL COST | |
| 1 | 6" Class 50 DIP water pipe | 60 | LF | $ | $ |
| 2 | 8" Class 50 DIP water pipe | 1720 | LF | $ | $ |
| 3 | DIP MJ fittings & accessories | 885 | LBS | $ | $ |
| 4 | 6" MJ gate valve & box | 3 | EA | $ | $ |
| 5 | 8" MJ gate valve & box | 4 | EA | $ | $ |
| 6 | 6" wet tap | 1 | EA | $ | $ |
| 7 | 8" wet tap | 1 | EA | $ | $ |
| 8 | 12" wet tap | 1 | EA | $ | $ |
| 9 | 3/4" or 1" water service piping (copper, PE, or PEX) | 450 | LF | $ | $ |
| 10 | 2" water service piping (copper or PE) | 60 | LF | $ | $ |
| 11 | 3/4" tie rods | 35 | LF | $ | $ |
| 12 | Mega-lugs | 1185 | LBS | $ | $ |
| 13 | Locking gaskets for POJ DIP | 36 | EA | $ | $ |
| 14 | Fire hydrant assembly (4' depth) | 2 | EA | $ | $ |
| 15 | Water meter box and assembly - 3/4" or 1" (replacement of existing) | 13 | EA | $ | $ |
| 16 | Water meter box and assembly - 2" (replacement of existing) | 2 | EA | $ | $ |
| 17 | 1" Air and vacuum release valve | 1 | EA | $ | $ |
| 18 | Manhole for air and vacuum release valve | 4 | VF | $ | $ |
| 19 | Manhole frame and cover - standard water | 1 | EA | $ | $ |
| 20 | 6" water line abandonment (cut & cap) | 2 | EA | $ | $ |
| 21 | Abandonment of existing fire hydrant | 1 | EA | $ | $ |
| 22 | Tree protection fencing and armoring | 280 | LF | $ | $ |
| 23 | Pavement cut & removal (all types) | 1050 | SY | $ | $ |
| 24 | Trench rock excavation | 25 | CY | $ | $ |
| 25 | Maintenance stone for pipe installation | 1050 | SY | $ | $ |
| 26 | Seeding and fine grading | 65 | SY | $ | $ |
| 27 | Drop inlet silt trap | 8 | EA | $ | $ |
| 28 | Miscellaneous unformed concrete | 6.5 | CY | $ | $ |
| 29 | Miscellaneous formed concrete | 3.5 | CY | $ | $ |
| 30 | Replacement of concrete sidewalk | 25 | SY | $ | $ |
| 31 | Replacement of concrete curb & gutter | 140 | LF | $ | $ |
| 32 | Reinforcing steel bars | 435 | LBS | $ | $ |
| 33 | Trench patch asphalt streets (Type B - Collector) | 625 | SY | $ | $ |
| 34 | Trench patch asphalt streets (Type C - Residential) | 425 | SY | $ | $ |
| 35 | Pavement striping - 24" wide stop bar (white) | 15 | LF | $ | $ |
| 36 | Pavement striping - 4" SSY (yellow) | 150 | LF | $ | $ |
| 37 | Pavement striping - 8' crosswalk (white) | 30 | LF | $ | $ |
| 38 | Maintenance of traffic | 1 | LS | $ | $ |
| 39 | Mobilization | 1 | LS | $ | $ |
| Oak Lane/Fairway Place Total Cost: | $ |
2027-017 Oak Lane and Hillview Drive Water Line Replacement Bid Form
Oak Lane/Fairway Place
ITEM # ITEM DESCRIPTION QTY UNIT COST TOTAL COST
1 6" Class 50 DIP water pipe 60 LF $ $
2 8" Class 50 DIP water pipe 1720 LF $ $
3 DIP MJ fittings & accessories 885 LBS $ $
4 6" MJ gate valve & box 3 EA $ $
5 8" MJ gate valve & box 4 EA $ $
6 6" wet tap 1 EA $ $
7 8" wet tap 1 EA $ $
8 12" wet tap 1 EA $ $
9 3/4" or 1" water service piping (copper, PE, or PEX) 450 LF $ $
10 2" water service piping (copper or PE) 60 LF $ $
11 3/4" tie rods 35 LF $ $
12 Mega-lugs 1185 LBS $ $
13 Locking gaskets for POJ DIP 36 EA $ $
14 Fire hydrant assembly (4' depth) 2 EA $ $
15 Water meter box and assembly - 3/4" or 1" (replacement of existing) 13 EA $ $
16 Water meter box and assembly - 2" (replacement of existing) 2 EA $ $
17 1" Air and vacuum release valve 1 EA $ $
18 Manhole for air and vacuum release valve 4 VF $ $
19 Manhole frame and cover - standard water 1 EA $ $
20 6" water line abandonment (cut & cap) 2 EA $ $
21 Abandonment of existing fire hydrant 1 EA $ $
22 Tree protection fencing and armoring 280 LF $ $
23 Pavement cut & removal (all types) 1050 SY $ $
24 Trench rock excavation 25 CY $ $
25 Maintenance stone for pipe installation 1050 SY $ $
26 Seeding and fine grading 65 SY $ $
27 Drop inlet silt trap 8 EA $ $
28 Miscellaneous unformed concrete 6.5 CY $ $
29 Miscellaneous formed concrete 3.5 CY $ $
30 Replacement of concrete sidewalk 25 SY $ $
31 Replacement of concrete curb & gutter 140 LF $ $
32 Reinforcing steel bars 435 LBS $ $
33 Trench patch asphalt streets (Type B - Collector) 625 SY $ $
34 Trench patch asphalt streets (Type C - Residential) 425 SY $ $
35 Pavement striping - 24" wide stop bar (white) 15 LF $ $
36 Pavement striping - 4" SSY (yellow) 150 LF $ $
37 Pavement striping - 8' crosswalk (white) 30 LF $ $
38 Maintenance of traffic 1 LS $ $
39 Mobilization 1 LS $ $
Oak Lane/Fairway Place Total Cost: $
PM - 6
| Hillview Drive/Valorie Court | |||||
|---|---|---|---|---|---|
| ITEM # | ITEM DESCRIPTION | QTY | UNIT COST | TOTAL COST | |
| 1 | 6" Class 50 DIP water pipe | 380 | LF | $ | $ |
| 2 | 8" Class 50 DIP water pipe | 1240 | LF | $ | $ |
| 3 | 12" Class 50 DIP water pipe | 20 | LF | $ | $ |
| 4 | DIP MJ fittings & accessories | 1000 | LBS | $ | $ |
| 5 | 6" MJ gate valve & box | 6 | EA | $ | $ |
| 6 | 8" MJ gate valve & box | 5 | EA | $ | $ |
| 7 | 12" MJ gate valve & box | 1 | EA | $ | $ |
| 8 | 6" wet tap | 1 | EA | $ | $ |
| 9 | 3/4" or 1" water service piping (copper, PE, or PEX) | 1200 | LF | $ | $ |
| 10 | 3/4" tie rods | 40 | LF | $ | $ |
| 11 | Mega-lugs | 1340 | LBS | $ | $ |
| 12 | Locking gaskets for POJ DIP | 24 | EA | $ | $ |
| 13 | Fire hydrant assembly (4' depth) | 5 | EA | $ | $ |
| 14 | Water meter box and assembly - 3/4" or 1" (replacement of existing) | 25 | EA | $ | $ |
| 15 | 1" Air and vacuum release valve | 1 | EA | $ | $ |
| 16 | Manhole for air and vacuum release valve | 4 | VF | $ | $ |
| 17 | Manhole frame and cover - standard water | 1 | EA | $ | $ |
| 18 | 6" water line abandonment (cut & cap) | 1 | EA | $ | $ |
| 19 | Abandonment of existing fire hydrant | 1 | EA | $ | $ |
| 20 | Pavement cut & removal (all types) | 1015 | SY | $ | $ |
| 21 | Trench rock excavation | 20 | CY | $ | $ |
| 22 | Maintenance stone for pipe installation | 1015 | SY | $ | $ |
| 23 | Seeding and fine grading | 255 | SY | $ | $ |
| 24 | Silt fence barrier | 170 | LF | $ | $ |
| 25 | Miscellaneous unformed concrete | 2 | CY | $ | $ |
| 26 | Miscellaneous formed concrete | 3 | CY | $ | $ |
| 27 | Replacement of concrete driveway | 30 | SY | $ | $ |
| 28 | Reinforcing steel bars | 300 | LBS | $ | $ |
| 29 | Trench patch asphalt streets (Type B - Collector) | 25 | SY | $ | $ |
| 30 | Trench patch asphalt streets (Type C - Residential) | 990 | SY | $ | $ |
| 31 | Maintenance of traffic | 1 | LS | $ | $ |
| 32 | Mobilization | 1 | LS | $ | $ |
| Hillview Drive/Valorie Court Total Cost: | $ |
| TOTAL BASE BID: (Oak Lane/Fairway Place Total Cost + Hillview Drive/Valorie Court Total Cost) | $ |
|---|
Hillview Drive/Valorie Court
ITEM # ITEM DESCRIPTION QTY UNIT COST TOTAL COST
1 6" Class 50 DIP water pipe 380 LF $ $
2 8" Class 50 DIP water pipe 1240 LF $ $
3 12" Class 50 DIP water pipe 20 LF $ $
4 DIP MJ fittings & accessories 1000 LBS $ $
5 6" MJ gate valve & box 6 EA $ $
6 8" MJ gate valve & box 5 EA $ $
7 12" MJ gate valve & box 1 EA $ $
8 6" wet tap 1 EA $ $
9 3/4" or 1" water service piping (copper, PE, or PEX) 1200 LF $ $
10 3/4" tie rods 40 LF $ $
11 Mega-lugs 1340 LBS $ $
12 Locking gaskets for POJ DIP 24 EA $ $
13 Fire hydrant assembly (4' depth) 5 EA $ $
14 Water meter box and assembly - 3/4" or 1" (replacement of existing) 25 EA $ $
15 1" Air and vacuum release valve 1 EA $ $
16 Manhole for air and vacuum release valve 4 VF $ $
17 Manhole frame and cover - standard water 1 EA $ $
18 6" water line abandonment (cut & cap) 1 EA $ $
19 Abandonment of existing fire hydrant 1 EA $ $
20 Pavement cut & removal (all types) 1015 SY $ $
21 Trench rock excavation 20 CY $ $
22 Maintenance stone for pipe installation 1015 SY $ $
23 Seeding and fine grading 255 SY $ $
24 Silt fence barrier 170 LF $ $
25 Miscellaneous unformed concrete 2 CY $ $
26 Miscellaneous formed concrete 3 CY $ $
27 Replacement of concrete driveway 30 SY $ $
28 Reinforcing steel bars 300 LBS $ $
29 Trench patch asphalt streets (Type B - Collector) 25 SY $ $
30 Trench patch asphalt streets (Type C - Residential) 990 SY $ $
31 Maintenance of traffic 1 LS $ $
32 Mobilization 1 LS $ $
Hillview Drive/Valorie Court Total Cost: $
TOTAL BASE BID:
(Oak Lane/Fairway Place Total Cost + Hillview Drive/Valorie Court Total Cost) $
PM - 7
ELECTION OF ESCROW ACCOUNT PROCEDURE FOR RETAINAGE
If determined to be the successful low bidder(s), the above signed elects to use the Escrow Account
Procedure for retainage.
Write "Yes" or "No" on above line
If the successful bidder elects to use the Escrow Account Procedure for Retainage, the "Escrow
Agreement" form shall be executed and submitted to the City of Lynchburg Engineering Division within
fifteen (15) calendar days after notification. If the "Escrow Agreement" form is not submitted within
the fifteen (15) day period, the Contractor shall forfeit his rights to the use of the Escrow Account
Procedure.
Company
Authorized Signature
PM - 8
EQUAL OPPORTUNITY REPORT STATEMENT
The Bidder shall complete the following statement by checking the appropriate blank as follows.
The Bidder has has not participated in a previous
contract subject to the nondiscrimination clause prescribed by Executive Order 10925, dated March 6,
1961, or Executive Order 11114 dated June 22, 1963.
In conjunction with the City of Lynchburg's policy to utilize Minority and Disadvantaged Business
Enterprises ("DBE") wherever possible, the Bidder has solicited quotations for labor, material and/or
services from the following Minority and Disadvantaged Business Enterprises:
NAME OF FIRM PERSON(S) CONTACTED DATE
Of those listed above, we intend, at this time, to utilize the following in the completion of the Work
required by this Construction Agreement:
"This firm assures that it will give its best efforts to utilize Minority and Disadvantaged Business
Enterprises whenever possible."
CERTIFIED BY: (Signature)
(Typed/Printed name & Title)
BIDDER'S NAME:
TAXPAYER IDENTIFICATION NUMBER:
This firm will perform all construction with its own employees and, therefore, is not required to
solicit quotations from DBEs.
FAILURE TO DOCUMENT AND REPORT DBE CONTACTS ON THIS FORM MAY BE A BASIS FOR REJECTION
OF THE BID AS NONCONFORMING.
PM - 9
STATEMENT OF EXPERIENCE
Proposer:
How Long In Business: At Current Address:
Principals: Title:
Title:
Title:
Type of Work Normally Performed:
Projects of this type previously completed:
1.
Amount $
2.
Amount $
3.
Amount $
Reference (for Projects listed above):
1.
Tel.No.
2.
Tel.No.
3.
Tel No.
PM - 10

With GovernmentContracts, you can:
Number Name Due Date Due Time IFB 2819 Attachment A-Forest Park
Roanoke City Public Schools
Bid Due: 12/12/2028
Bid Number NIGP Class Description Pre-Bid Date/Time Date/Time Due Buyer Actions IFB1944 91036
York County
Bid Due: 4/14/2030
Opportunity History Complete View Original Synopsis Special Notice Jan 24, 2019 5:24 pm
Department of the Navy
Bid Due: 3/29/2033
RFP 1294-3 RFP 0815-21-CAC; Camps & Classes Status: Open Time Left:3703 days Closing:
State Government of Virginia
Bid Due: 10/31/2031