| Location: | South Carolina |
|---|---|
| Posted: | Apr 3, 2025 |
| Due: | Apr 22, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The contractor shall provide all labor, materials, equipment, and transportation necessary to remove the existing finished flow meter and install a new 20-inch V-Cone Flow assembly as required at 1975 Sandy Island Rd, Litchfield, SC 29585.
A MANDATORY pre‐bid meeting and site inspection will be held on April 15, 2025, at 9:00 AM, at the Waccamaw Surface Water Treatment Plant at 1975 Sandy Island Rd, Litchfield, SC 29585 to allow bidders to inspect the site and more thoroughly determine the extent of work needed to properly remove existing and installation the new V-Cone Flow Assembly. All Bidders must attend this meeting to be considered “responsive”.

With GovernmentContracts, you can:
...5400029841 Water Treatment Services Natural Resources 07/07/2026 10:00:00 AM...
State Fiscal Accountability Authority
Bid Due: 7/07/2026
...providing all NSF-certified materials, equipment, and labor to remove solids from the water ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/02/2026
...of this document, but also must consider the unique local context of the ...
City of Clemson
Bid Due: 7/14/2026
...Project ID: 2110-RFP Title: Diesel Pump for Wastewater Treatment Plant Addenda: 0 Release ...
City of Rock Hill
Bid Due: 6/23/2026