| Location: | South Carolina |
|---|---|
| Posted: | Apr 3, 2025 |
| Due: | Apr 22, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The contractor shall provide all labor, materials, equipment, and transportation necessary to remove the existing finished flow meter and install a new 20-inch V-Cone Flow assembly as required at 1975 Sandy Island Rd, Litchfield, SC 29585.
A MANDATORY pre‐bid meeting and site inspection will be held on April 15, 2025, at 9:00 AM, at the Waccamaw Surface Water Treatment Plant at 1975 Sandy Island Rd, Litchfield, SC 29585 to allow bidders to inspect the site and more thoroughly determine the extent of work needed to properly remove existing and installation the new V-Cone Flow Assembly. All Bidders must attend this meeting to be considered “responsive”.

With GovernmentContracts, you can:
...; Sewer Authority Ad Publish Date: August 12, 2026 Solicitation #: 2027-IFB-005 Direct ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/15/2026
...Bid Number: 27-04 Bid Title: Services for Sanitary Sewer System Hydraulic Modeling and ...
City of Lexington
Bid Due: 10/20/2026
...Bid Number: 27-04 Bid Title: Services for Sanitary Sewer System Hydraulic Modeling and ...
Town of Lexington
Bid Due: 10/20/2026