| Location: | California |
|---|---|
| Posted: | Oct 1, 2025 |
| Due: | Oct 22, 2025 |
| Agency: | City of Palo Alto |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: On-Call Surveying Services
Addenda: 0
Release Date: 10/1/2025
Due Date: 10/22/2025
The selected Consultant(s) will be working with various work groups within the Public Works Engineering Services Division including Streets and Sidewalks, Parks, Buildings and Storm Drain. This contract will be open to more than one work group, therefore the consultant may be asked to work on more than one project at a time. All services to be performed by the Consultant(s) shall be documented in a task order to be executed by the Consultant(s) and City. The specified work required for these projects will be determined as the projects are developed including a detailed scope, schedule and budget. Consultant(s) shall provide the City with an hourly rate for Land Surveyor services. Below are descriptions of required tasks for each work group.
Streets and Sidewalks, Parks, Building and Storm Drain – Topographic survey services will be used to provide base maps for preparation of plans for proposed improvement projects.
The Consultant shall provide the following topographic survey services:
Additional features required for Storm Drain projects include the following:
Deliverables – prepare and submit the following:
The City will provide existing infrastructure and right-of way information from City of Palo Alto Geographic Information System (GIS) Streets. Work on arterial and collector streets (including Alma, Middlefield, and Embarcadero will not be permitted between the hours of 7 a.m. and 9 a.m. and 4 p.m. and 6 p.m. to avoid traffic congestion to the public. Consultant shall be responsible for all traffic control for survey crews. The Consultant shall comply will the MUTCD Rolling/mobile traffic control for short term work. Any work that is longer than 15 minutes at one particular spot shall require a more specific traffic control plan to be submitted for the City’s Transportation Division’s review and approval. Consultant shall be responsible for all traffic control for survey crews.

With GovernmentContracts, you can:
...Classification UNSPSC Classification Description 41114200 Land surveying instruments 81101500 Professional... surveying 95111502 Land ...
State Government of California
Bid Due: 6/08/2026
...Contractors Construction 541370: Surveying and Mapping (except Geophysical) Services Professional... 541360: Geophysical Surveying ...
City of Los Angeles
Bid Due: 6/26/2026
.../professional land surveying for the development of construction plans and specifications...
City of Santa Cruz
Bid Due: 6/30/2026
...consultants with experience and expertise in: 1. Surveying and mapping; 2... permitting; 25. ...
State Government of California
Bid Due: 9/25/2026