SLAC LCLS-II-HE PCW Skid Upgrade Project

Location: California
Posted: Mar 20, 2026
Due: Apr 2, 2026
Agency: ENERGY, DEPARTMENT OF
Type of Government: Federal
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: SLAC_RFP_362602
Publication URL: To access bid details, please log in.
Follow
SLAC LCLS-II-HE PCW Skid Upgrade Project
Active
Contract Opportunity
Notice ID
SLAC_RFP_362602
Related Notice
Department/Ind. Agency
ENERGY, DEPARTMENT OF
Sub-tier
ENERGY, DEPARTMENT OF
Office
SLAC Natl Accel Lab -DOE Contractor
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Sources Sought (Original)
  • Original Published Date: Mar 20, 2026 02:16 pm PDT
  • Original Response Date: Apr 02, 2026 05:00 pm PDT
  • Inactive Policy: 15 days after response date
  • Original Inactive Date: Apr 17, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code:
  • NAICS Code:
    • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
  • Place of Performance:
    Menlo Park , CA 94025
    USA
Description

THIS POSTING IS FOR "SOURCES SOUGHT ONLY." PLEASE DO NOT SUMBIT BIDS. While the DRAFT RFP package has been included with this post, the RFP has NOT yet been released.



Interested Vendors should express their interest on the Interested Vendors List through this SAM.GOV posting or by emailing the procurement specialist.



DISCLAIMER:



Please note that any responses to this sources sought posting is purely on a voluntary basis. SLAC is not requesting a proposal, any pricing, or any other information that could be considered confidential or proprietary to be submitted in response to this posting or any part of this posting. Any submissions that contain pricing, proprietary information, or confidential information will be discarded by SLAC.





MINIMUM QUALIFICATIONS:




  • The Offeror’s General Contractor’s license has not been revoked within the past five (5) years.

  • The Offeror’s company has not been debarred within the past five (5) years from working on any U.S. government contracts/subcontracts.

  • Neither the Offeror’s firm, nor any of its owners or officers have been convicted of a crime involving the awarding of the contract of a government (U.S. Federal, State, and City) construction project, or the bidding or performance of a government contract.

  • Offeror must have an established local office for a minimum of 2 years in the San Francisco Bay Area. The San Francisco Bay Area is defined as the following 10 counties: Santa Clara, San Mateo, San Francisco, Alameda, Contra Costa, Marin, Napa, Sonoma, Solano, and Santa Cruz Counties

  • The Offeror must list any U.S. projects within the past five (5) years that have been terminated for default. The Offeror’s company cannot have any U.S. projects within the past five (5) years that have been terminated for default.

  • The Offeror must have previous experience working at Department of Energy (DOE) and/or Department of Defense (DOD) Facilities.





PLANNED SCOPE AND DESCRIPTION OF SERVICES:



1. Room 310 CO2 Chiller Infrastructure



Subcontractor shall provide labor, shop drawings, materials, and resources required to complete structural and architectural modifications, mechanical, plumbing, and electrical systems, and necessary demolitions according to the construction authorization and inspection record requirements, construction drawings, and specifications reference #1, #2 and #3. This includes:




  1. Installation of mechanical piping, valves, and associated utilities necessary to support the chiller operation.

  2. Installation of electrical distribution infrastructure, conduit, and wiring to provide power and controls for future SLAC provided CO₂ skids.

  3. Architectural and facility modifications within Room 310 to support equipment access, installation clearances, and safety requirements.

  4. Transportation and relocation of the 4ATS1A-950 transfer switch to the designated new location as identified in the construction drawings supporting the CO₂ Chiller Infrastructure Project.

  5. Coordination with SLAC technical teams and other contractors to ensure seamless interface with the separately managed future SLAC CO₂ skid installation and system commissioning.





2. B950A PCW Skid Demo and Relocation



Subcontractor shall provide labor, shop drawings, materials, and resources required to complete structural and architectural modifications, mechanical, plumbing, and electrical systems, and necessary demolitions according to the construction authorization and inspection record requirements, construction drawings, and specifications reference #4, #6, and #7. This includes:




  1. Disconnect and safely remove the existing B950A PCW skid located in the NEH, including associated mechanical, electrical, and control connections.

  2. Perform necessary demolition of piping, supports, and ancillary equipment for relocation, including flushing.

  3. Relocate reusable components and equipment to the designated staging or storage area identified by SLAC.

  4. Cap and label all disconnected utilities per SLAC standards.

  5. Coordinate with SLAC’s Technical Systems and Facilities Engineering to ensure that no disruption occurs to other critical cooling loops.

  6. Manage and dispose of all demolition debris and fluids per SLAC ESH and waste management procedures.





3. B950 PCW System Upgrade



Subcontractor shall provide labor, shop drawings, materials, and resources required to complete structural and architectural modifications, mechanical, plumbing, and electrical systems, and necessary demolitions according to the construction authorization and inspection record requirements, construction drawings, and specifications reference #4, #5, #6, and #7. This includes:



Installation of New PCW Skid




  1. Receive, offload, and install the new PCW skid at the designated NEH location.

  2. Connect to existing PCW supply and return headers, electrical power, and controls per the design documents.

  3. Perform alignment, anchorage, vibration isolation, and torque verification per manufacturer specifications.

  4. Support start-up, flushing, and commissioning of the new skid in coordination with SLAC Technical Systems and Commissioning teams.

  5. Provide as-built documentation, O&M manuals, and test reports upon completion.



PCW Line Upsizing (Basement and Sub-Basement)




  1. Remove existing PCW piping sections and install new, larger-diameter piping as indicated in the IFC drawings.

  2. Provide temporary scaffolding and access platforms to safely perform work in the sub-basement.

  3. Remove and later reinstall a portion of existing ductwork and one (1) light fixture to gain access to the PCW lines.

  4. Pressure test, flush, and label new piping per SLAC mechanical standards.

  5. Coordinate with SLAC CM to sequence work to minimize disruption to nearby systems.





SUBMISSION INSTRUCTIONS:



Interested construction contractors with the skills, capability, workload capability, and ability to obtain bonding to complete the planned project scope are invited to submit a written response to this Sources Sought. Please provide the following information:




  1. Company Name

  2. Name, telephone number, and email address of a company point of contact who has the authority and knowledge to clarify responses

  3. Bonding capacity



Please provide your response via email to Sam Kallas at skallas@slac.stanford.edu with “SLAC 362602 Sources Sought Response” inserted in the subject line by 5PM PST on April 2, 2026.



All interested firms must be actively registered in SAM.gov to be eligible.


Attachments/Links
Contact Information
Contracting Office Address
  • 2575 Sand Hill Road
  • Menlo Park , CA 94025
  • USA
Primary Point of Contact
Secondary Point of Contact


History
  • Mar 20, 2026 02:16 pm PDTSources Sought (Original)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...and support facilities; constructing site improvements and fences, excavation, and pavement replacement...; providing ...

Orange County Water District

Bid Due: 6/08/2026

...for Construction of Transit Operations Maintenance Facility Addenda: 0 Release Date: 4/9/2026 Due... ...

City of Pasadena

Bid Due: 6/08/2026

...services such as testing, start-up, and commissioning, all as required by the Contract ...

City of Pacifica

Bid Due: 6/30/2026

...and support facilities; constructing site improvements and fences, excavation, and pavement replacement...; providing ...

Orange County Water District

Bid Due: 6/08/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.