This project provides for the installation of approximately 750 linear feet of 8-in ductile iron
pipe north of the existing dog track on Greyhound Park Road. The new water main will
create a looped system and provide a redundant water supply, supporting improved
reliability and service on Chaplain Schmitt Island.
Each Bidder must visit the project site(s) of the proposed work to fully acquaint itself with the
existing conditions relating to the project and must inform itself as to the facilities involved, the
difficulties and the restrictions related to the performance of the Contract. Each Bidder must
thoroughly examine and familiarize itself with the specifications and all other Contract
Documents. The Contractor by the execution of the Contract shall in no way be relieved of
any obligation under the contract due to Contractor’s failure to receive or examine any contract
document or to visit the site and acquaint itself with the conditions there existing. City will beSECTION 00200
Page 2 of 5
justified in rejecting any claim based on facts regarding which the Contractor should have been
aware of as a result of its inspection.