| Location: | Texas |
|---|---|
| Posted: | Apr 3, 2025 |
| Due: | Apr 10, 2025 |
| Agency: | City of Fort Worth |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-0106 |
| Publication URL: | To access bid details, please log in. |
Project Description: The major work will consist of the (approximate) following: [2390 LF of 36” Pipe Enlargement to proposed 36-inch minimum Inside Diameter], [880 LF of 33” Pipe Enlargement to proposed 33-inch minimum Inside Diameter], [20 LF of 36” Sewer Pipe w/ CSS Backfill], [12 LF of 12” Sewer Pipe by Open Cut], [790 LF of 36” Sewer Pipe w/ Acceptable Backfill], [14 EA of 6’ Diameter Manhole], [Bypass Pumping], [4100 LF of Post-CCTV Inspection], [111 EA of 6”-12” Tree Removal], [10 EA of 12”-18” Tree Removal], [180 SF of 4” Concrete Trail], [1750 SF of 5” Reinf. Concrete Trail]

With GovernmentContracts, you can:
Brazoria County Expressway Phase II Follow Solicitation Solicitation ID: 26-63 Status: Posted Contact
State Government of Texas
Bid Due: 9/29/2026
Grounds Maintenance Amarillo District Follow Solicitation Solicitation ID: 601340000066528 Status: Posted Contact Name:
State Government of Texas
Bid Due: 9/25/2026
Bid Information Type Request for Proposal Status Issued Number 2026-15 (Plant Material Supply
City of Lancaster
Bid Due: 9/30/2026
RFB 2026-053 Zoo Commissary Remodel Follow Solicitation Solicitation ID: 2026-053-1 Status: Posted Contact
State Government of Texas
Bid Due: 9/29/2026