| Location: | Nevada |
|---|---|
| Posted: | Apr 3, 2025 |
| Due: | Apr 24, 2025 |
| Agency: | Nevada Government eMarketplace (NGEM) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 010492 |
| Publication URL: | To access bid details, please log in. |
Bid Information
| Type | Invitation for Bid |
| Status | Issued |
| Number | 010492 (AMSWTF-Admin, Warehouse, Facility Maintenance, and Chlorine #1 Building-Roof Replacement) |
| Issue Date & Time | 4/3/2025 10:00:06 AM (PT) |
| Close Date & Time | 4/24/2025 10:00:00 AM (PT) |
| Question Cut Off Date | 4/19/2025 10:00:00 AM (PT) |
| Notes |
Southern Nevada Water Authority invites qualified firms (Bidders) to submit Bids for the following work, see Contract Documents for full details.
The Site of the Work is located at the Alfred Merritt Smiths Water Treatment Facility (AMSWTF), 243 Lake Shore Road, Boulder City, NV 89005. The Work consists of removal of existing Alfred Merritt Smiths Water Treatment Facility Administration, Warehouse, Facility Maintenance, Chlorine #1, and Mechanical Treatment building’s mechanically attached roofing system including existing insulation and installation of a new Thermoplastic Polyolefin (TPO) roofing system; replacement of flashing where it exists and repair of the existing roof deck after the removal process to ensure a tight seal of the roof. Work on the Water Treatment Plant buildings also includes removal of existing joint sealant on the interior, cleaning the joints, and installing new joint sealant. Moreover, the work covers installation of roof walkway to provide access to and around the roof equipment of the buildings and installation of a ladder to access all areas of the roof at Electrical building. Concrete curbing will be installed under equipment if missing, damaged or not having a properly installed curb. Repair and paint stucco on the existing roof screen walls. The flashing on the screen walls shall be replaced. Furthermore, the scope of work consists of removal of the existing roof pavers and installation of a new roof deck with railing at the roof entrance, providing two portable ramps resting on a TPO appropriate roof pad.
The contractor shall install electrical and mechanical equipment support where it does not exist. Lightning rod ground wire, air terminals, and conductor connectors must be removed and remounted after TPO roof is installed. Furthermore, the scope of work consists of removal of electrical equipment, conduit, and existing metal frame, electrical wall penetration repairs and seal. Existing non-contained cables are to be installed in new conduits with support blocks. For existing electrical conduit stub-ups, existing rubber/vinyl jack/boot shall be replaced with new in kind.
The Contractor is to provide equipment, tools, materials, and services necessary to lift and/or move any equipment, for proper installation of the TPO roofing system. The existing roof mounted equipment is to be left in place and NOT to be removed for installation of the new roofing system, except where the new roofing system cannot be installed in accordance with the installer and manufacturer’s installation details and warranty requirements, or where such equipment is to be removed to facilitate installation of the new roofing system.
Engineer's estimate: $2,139,214
Questions regarding this bid must be directed to the Bid Contact listed in this Bid.
|
| Name | Chetan Champaneri Senior Purchasing Analyst |
| Address |
1001 S. Valley View Blvd
Las Vegas, NV 89107 USA |
| Phone | 1 (702) 258-3849 |
| Fax | |
| Purchasing.HelpDesk@lvvwd.com |
| File Name | Description | File Size | ||
|
||||
| 3141S.Final_Specifications.pdf (please login to view this document) |
Contract Documents (Not including drawings)
|
2.34 MB | 314991 | 6590924 |
| 3141S.Final_Plans.pdf (please login to view this document) | Drawings | 6.77 MB | 314991 | 6590923 |
| 00 41 00 Bidder Statement of Authority to Submit Bid Form.pdf (please login to view this document) | Bidder Statement of Authority to Submit Bid Form | 81 KB | 314991 | 6590915 |
| 00 41 10 Bid Bond.pdf (please login to view this document) | Bid Bond | 80 KB | 314991 | 6590916 |
| 00 43 35 Five Percent Subcontractor Information.pdf (please login to view this document) | Five Percent Subcontractor Information | 70 KB | 314991 | 6590917 |
| 00 43 36 Two Hour Subcontractor Information.pdf (please login to view this document) | Two Hour Subcontractor Information | 77 KB | 314991 | 6590918 |
| 00 43 37 Supplier Information Form.pdf (please login to view this document) | Supplier Information Form | 61 KB | 314991 | 6590919 |
| 00 43 40 Security Checklist.pdf (please login to view this document) | Security Checklist | 134 KB | 314991 | 6590920 |
| 00 45 00 Bidder Project Management Team Qualifications.pdf (please login to view this document) | Bidder Project Management Team Qualifications | 278 KB | 314991 | 6590921 |
| 00 45 46 Affidavit Pertaining to Preference Eligibility.pdf (please login to view this document) | Affidavit Pertaining to Preference Eligibility | 78 KB | 314991 | 6590922 |

With GovernmentContracts, you can: