REPLACE MELROSE BACKUP GENERATOR

Location: Federal
Posted: May 8, 2026
Due: May 11, 2026
Agency: INTERIOR, DEPARTMENT OF THE
Type of Government: Federal
Category:
  • 61 - Electric Wire, and Power and Distribution Equipment
Solicitation No: 140P5226R0006
Publication URL: To access bid details, please log in.
Follow
61--REPLACE MELROSE BACKUP GENERATOR
Active
Contract Opportunity
Notice ID
140P5226R0006
Related Notice
Department/Ind. Agency
INTERIOR, DEPARTMENT OF THE
Sub-tier
NATIONAL PARK SERVICE
Office
SER WEST(52000)
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
  • Updated Published Date: May 08, 2026 12:48 pm CDT
  • Original Published Date: Apr 28, 2026 09:07 am CDT
  • Updated Date Offers Due: May 11, 2026 02:00 pm CDT
  • Original Date Offers Due: May 11, 2026 02:00 pm CDT
  • Inactive Policy: Manual
  • Updated Inactive Date: May 08, 2027
  • Original Inactive Date: Apr 28, 2027
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: 6115 - GENERATORS AND GENERATOR SETS, ELECTRICAL
  • NAICS Code:
    • 238290 - Other Building Equipment Contractors
  • Place of Performance:
Description View Changes
Amendment 0001: Questions and Answers.
1.        Consider a quote for materials only.
No. The Government will not consider a materials-only quote for this requirement.
The solicitation is for a complete firm-fixed-price generator replacement, including all labor, materials, tools, equipment, supervision, removal of existing equipment, installation, electrical integration, commissioning, load testing, training, and closeout documentation.
Offerors must submit a complete turnkey quote that satisfies the full Statement of Work. Materials-only pricing will not be considered responsive to the solicitation.
All other terms and conditions of the solicitation and Statement of Work remain unchanged.

2.        Please advise if replacing the roof structure and new generator exhaust shall be included in the SOW as an alternate.
The existing generator roof/cover structure is not identified in the Statement of Work for replacement. The Government does not intend to add replacement of the roof/cover structure as an alternate at this time.
The existing roof/cover structure is bolted to the supporting steel posts and can be temporarily unbolted and removed, if necessary, to allow removal of the existing generator and installation of the new generator. The contractor shall field-verify existing conditions and determine the means and methods necessary to perform the work. If the contractor determines that temporary removal of the existing roof/cover structure is necessary, the contractor shall include temporary removal and reinstallation of the existing roof/cover structure in its price. If temporarily removed, the existing roof/cover structure shall be protected from damage and reinstalled in its current configuration unless otherwise directed by written solicitation amendment.
Replacement of the roof/cover structure is not included in the current scope.
The new generator exhaust shall be provided and installed in accordance with the generator manufacturer¿s requirements, applicable codes, and the Statement of Work. The contractor may reuse existing exhaust routing/components only if compatible with the new generator, manufacturer requirements, and applicable code. Any required exhaust modifications necessary for a complete, operational, code-compliant installation shall be included in the contractor¿s price.

3.        Is there a requirement to replace the wire from the building electrical panel to the transfer switch?
Replacement of the existing wire from the building electrical panel to the transfer switch is not included in the Statement of Work.
The existing underground/building feeder route is located within the historic site context and is not intended to be removed, replaced, or re-routed under this contract. The contractor shall not disturb historic ground or replace the existing building-to-transfer-switch wiring unless specifically directed by written solicitation amendment.
The contractor remains responsible for making the required exterior equipment connections, terminations, grounding/bonding, and code-compliant installation of the new generator and automatic transfer switch using the existing service conditions provided. Any work shall be limited to the generator/ATS replacement scope identified in the Statement of Work.

4.        Sherwin-Williams is asking what the exact color number is that the end-user is looking for, if they have a specific manufacturer's color in mind.
The contractor should submit actual color samples or manufacturer color documentation for review before ordering. The color needs to be reviewed in context with the Melrose setting and existing site conditions before final approval.
Of the colors listed, Bottle Green 6007, Moss Green 6005, and Pine Green 6028 appear to be the closest options for consideration. Emerald Green 6001 appears less appropriate based on the name and general color tone, but final determination should be based on actual samples.
The Government is not identifying a specific manufacturer¿s color at this time. Final color approval should remain subject to COR review of submitted color samples/documentation prior to ordering.
Attachments/Links
Contact Information
Contracting Office Address
  • 2680 NATCHEZ TRACE PARKWAY
  • TUPELO , MS 38804
  • USA
Primary Point of Contact
Secondary Point of Contact


History

Related Document

Apr 28, 2026[Combined Synopsis/Solicitation (Original)] REPLACE MELROSE BACKUP GENERATOR
May 11, 2026[Combined Synopsis/Solicitation (Updated)] 61--REPLACE MELROSE BACKUP GENERATOR
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Follow 61--WIRING HARNESS,BRAN Active Contract Opportunity Notice ID SPE4A626U3092 Related Notice... WIRING HARNESS,BRAN: ...

DEPT OF DEFENSE

Bid Due: 6/05/2026

...Follow 59--WIRING HARNESS,BRAN Active Contract Opportunity Notice ID SPE4A626T74Q2 Related Notice... 5995011127018 WIRING ...

DEPT OF DEFENSE

Bid Due: 6/08/2026

...Follow 61--WIRING HARNESS Active Contract Opportunity Notice ID SPE4A626U3107 Related Notice... Place of ...

DEPT OF DEFENSE

Bid Due: 6/12/2026

...Follow 61--WIRING HARNESS,BRAN Active Contract Opportunity Notice ID SPE4A626U3099 Related Notice... Manufacturing Place ...

DEPT OF DEFENSE

Bid Due: 6/11/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.