| Location: | Pennsylvania |
|---|---|
| Posted: | Apr 29, 2025 |
| Due: | Jun 10, 2025 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Susquehanna Township Authority, Dauphin County |
| Publication URL: | To access bid details, please log in. |
Project Description: The work includes all material, labor, and equipment necessary for the installation of a new grinder, three new pumps and controls (including piping, valves), modifications to the wet well, flood hardening improvements, HVAC and Plumbing Improvements, replacement of the diesel electric generator, transfer switch, motor control center, and all associated electrical work as shown on the drawings and as specified. This includes bypass pumping and demolition of existing equipment. The project is located in Susquehanna Township, Dauphin County.

With GovernmentContracts, you can:
.... * Excavation, stockpiling and backfilling. * Connection to existing electrical utilities * ...
PennBid
Bid Due: 6/19/2026
...Construction and Contract 2026-02E: Electrical Construction Ref. #: Doylestown Township Municipal Authority... County, ...
PennBid
Bid Due: 6/11/2026
...County, PA Design Firm: Ebert Engineering Project Description: The New Morgan Borough Utilities... ...
PennBid
Bid Due: 6/17/2026
...Construction and Contract 2026-02E: Electrical Construction Ref. #: Doylestown Township Municipal Authority... County, ...
PennBid
Bid Due: 7/09/2026