H399--FTD Roof Inspection - Service Contract

Location: Federal
Posted: Jul 22, 2026
Due: Jul 31, 2026
Agency: VETERANS AFFAIRS, DEPARTMENT OF
Type of Government: Federal
Category:
  • H - Quality Control, Testing, and Inspection Services
Solicitation No: 36C25026Q0698
Publication URL: To access bid details, please log in.
Follow
H399--FTD Roof Inspection - Service Contract
Active
Contract Opportunity
Notice ID
36C25026Q0698
Related Notice
Department/Ind. Agency
VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
250-NETWORK CONTRACT OFFICE 10 (36C250)
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Jul 22, 2026 09:22 am EDT
  • Original Published Date: Jul 06, 2026 04:02 pm EDT
  • Updated Date Offers Due: Jul 31, 2026 01:00 pm EDT
  • Original Date Offers Due: Jul 24, 2026 11:00 am EDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Aug 30, 2026
  • Original Inactive Date: Aug 23, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: H399 - INSPECTION- MISCELLANEOUS
  • NAICS Code:
    • 541350 - Building Inspection Services
  • Place of Performance:
Description View Changes
FT. THOMAS DOMICLIARY (FTD) ROOF INSPECTION
FOR THE
FT. THOMAS DOMICLIARY (FTD) - FT. THOMAS, KY
QUESTIONS AND ANSWERS (RFIs)
TO REQUEST FOR QUOTE (RFQ) NUMBER
36C25026Q0698

QUESTIONS AND ANSWERS

RFI #1 Question: Is the full Performance Work Statement (PWS) or Statement of Work available yet, or will it be issued closer to the solicitation date? We currently only have the presolicitation notice.

Answer: Yes. The PWS has been uploaded to www.SAM.gov
RFI #2 Question: For the structural/decking framing assessment component, is a licensed Professional Engineer (PE) stamp/certification required on the report, or is a qualified visual and probe-based structural assessment sufficient to meet the requirement?

Answer: PE Stamp is not required.

RFI #3 Question: Is there a specific infrared thermography certification standard the Government requires (e.g., Infraspection Institute, InterNACHI, ASNT), or is any recognized industry certification acceptable?

Answer: Specific infrared tech does not matter, must be able to determine water intrusion.

RFI #4 Question: Will there be a site visit or walkthrough offered prior to quote submission?

Answer: No.

RFI #5 Question: We would like to know if someone has the roof size, number of buildings or any building plan we can use to draft a quote.

Answer: SF is roughly the same as the 3rd floor ~25,000SF. There is only one (1) building. See attachment for roof plan.
RFI #6 Question: We need additional information to quantify the number of roof areas, square footage, and method of accessing the roof areas to prepare a firm offer.Â

Answer: One (1) roof area. SF is roughly the same as the 3rd floor ~25,000SF. Accessible from stairwell. See attachment for roof plan.

RFI #7 Question: Is the roof assessment limited to the main building only, or does it include multiple buildings within the Ft. Thomas Campus? If multiple buildings are included, would you please identify the applicable building(s)?
Answer: One roof area on main building (Building 64).
RFI #8 Question: The Performance Work Statement indicates that existing roof and building floor plans will be provided when available. Could you please confirm whether these plans are currently available.

Answer: Photos of existing drawings attached.

RFI #9 Question: The PWS requires an assessment of the roof decking and structural framing where accessible. Could you please provide additional information regarding the anticipated accessibility of the structural framing (e.g., attic access, exposed framing, ceiling access, or other accessible areas)?

Answer: Above ceiling from floor below. Floor below is currently vacant.
RFI #10 Question: What is access to the roof?

Answer: Roof is accessible via stairs.
RFI #11 Question: What is the total size of the assessment area (SF)?

Answer: ~25,000SF

RFI #12 Question: Is the roof currently under warranty?

Answer: No

RFI 13 Question: Has environmental testing been performed?

Answer: No

RFI #14 Question: Can existing drawings be shared during the bid phase?

Answer: Photos of existing drawings attached.
RFI #15 Question: Are canopies included?

Answer: No

RFI #16 Question: Is the facility occupied and will it be in operation during the deck inspection?

Answer: The facility is occupied and will be in operation during the inspection. The floor immediately below is vacant and accessible.

RFI #17 Question: Is a structural assessment per IEBC adequate? Â Or is an IBC assessment required?

Answer: IEBC is adequate.

RFI #18 Question: Can a drone be utilized for an IR scan?
If so, can IR scan be performed during sunrise or sundown hours?

Answer: Drones can be used in accordance with Ft Thomas, KY drone regulations. Time/day to be coordinated with COR once in construction.

RFI #19 Question: Are RF antennas present?
If so, is there interest in the winning contractor performing an RF survey (includes an RF heatmap)?

Answer: RF Antennas may be present. No RF heatmap will be required.

RFI #20 Question: Can windows be utilized for access for lower roofs?

Answer: There is only one roof, accessible via stairwell.

RFI #21 Question: Could you identify the roof system types for the approximately 15 roof areas (for example, EPDM, TPO, modified bitumen, built-up/ballasted, etc.)? This will help us determine the appropriate moisture survey methodology.

Answer: Refer to existing drawings for roof type.

RFI #22 Question: The PWS references existing roof plan files. Are those plans available to offerors before award, or will they only be provided to the successful contractor?

Answer: Photos of existing drawings attached.
RFI #23 Question: If limited test cuts or core samples become necessary to verify concealed roof conditions, would prior written approval from the VA be required before performing that work?
Answer: Written approval is required prior to any destructive testing/investigation.

RFI #24 Question: I would also appreciate clarification regarding the insurance requirement. If Nine3Six Solutions serves as the prime contractor and utilizes a qualified roofing inspection subcontractor to perform the on-site technical inspection services, does the solicitation require the prime contractor to maintain the insurance specified in the solicitation, or would the subcontractor's insurance satisfy that requirement for the services they perform?
Answer: Yes, the prime contractor shall maintain the required insurance and not the subcontractor.
RFI #25 Question: Lastly, I noticed Attachment VAAR 852.219-75 (Limitations on Subcontracting Certificate). Since this procurement is identified as a Total Small Business Set-Aside under NAICS 541350 rather than a VOSB or SDVOSB set-aside, could you please confirm whether that attachment is applicable to this acquisition?
Answer: This has been rescinded (VAAR 852.219-75).

Attachments/Links
Contact Information
Contracting Office Address
  • VISN 10 CONSOLIDATED CONTRACTING 4100 WEST 3RD STREET
  • DAYTON , OH 45428
  • USA
Primary Point of Contact
Secondary Point of Contact


History

Related Document

Jul 6, 2026[Presolicitation (Original)] H399--FTD Roof Inspection - Service Contract
Jul 6, 2026[Solicitation (Original)] H399--FTD Roof Inspection - Service Contract
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...CDBG Water Main Replacement Rebid for the Town of Littleville Littleville, Alabama August ...

Goodwyn Mills Cawood(GMC)

Bid Due: 8/13/2026

...Toutant Beauregard Rd. Water Main and Wurzbach Rd. Swing Tie Project Solicitation No. ...

San Antonio Water System

Bid Due: 8/26/2026

...DIRECTORS 41ST STREET WATER MAIN REPLACEMENT PROJECT - KENNEDY AVENUE TO 5TH STREET ...

MPN

Bid Due: 7/14/2075

...Perry County Water Authority - 2026 Heiberger Area Water Main Improvements (CR-47 & ...

Goodwyn Mills Cawood(GMC)

Bid Due: 8/20/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.