AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT

Location: Arizona
Posted: Nov 14, 2025
Due: Nov 19, 2025
Agency: TRANSPORTATION, DEPARTMENT OF
Type of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: 6982AF25B000019
Publication URL: To access bid details, please log in.
Follow
AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT
Active
Contract Opportunity
Notice ID
6982AF25B000019
Related Notice
6982AF25B000019
Department/Ind. Agency
TRANSPORTATION, DEPARTMENT OF
Sub-tier
FEDERAL HIGHWAY ADMINISTRATION
Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Nov 14, 2025 01:02 pm MST
  • Original Published Date: Oct 20, 2025 06:49 am MDT
  • Updated Date Offers Due: Nov 19, 2025 02:00 pm MST
  • Original Date Offers Due: Nov 19, 2025 02:00 pm MST
  • Inactive Policy: 15 days after date offers due
  • Updated Inactive Date: Dec 04, 2025
  • Original Inactive Date: Dec 04, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside: No Set aside used
  • Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
  • NAICS Code:
    • 237310 - Highway, Street, and Bridge Construction
  • Place of Performance:
    Payson , AZ 85541
    USA
Description

PROJECT NUMBER: AZ FS 289(1)



PROJECT NAME: AZ NFSR 289 BRIDGE REPLACEMENT



PROJECT DESCRIPTION: The project is located in the Tonto National Forest approximately 18 miles East of Payson, AZ. The existing Tonto Creek Bridge (no. 031204000003356) was built in 1956 and is a single lane, concrete slab bridge. NFSR 289 is a two-lane roadway that accesses several residential homes, a fish hatchery, and a summer camp along with many recreational sites and trailheads. The purpose of this project is to replace the existing Tonto Creek Bridge, expand the Horton Springs Parking Lot and improve pedestrian and vehicular safety and access to the recreation sites around the Tonto Creek Bridge on NFSR 289.



SCOPE OF THE WORK: The scope of the project includes reconstructing a portion of FR 289, removing the existing bridge and constructing a new single-span bridge over Tonto Creek including new sidewalk and reconstruction of the Horton Springs Parking Lot. This project includes removal of the existing two-span bridge, including removal of the existing pier. The project also includes channel grading in Tonto Creek. The new roadway and bridge will be constructed East of the existing alignment (upstream of the existing bridge) to minimize impacts to public traffic.



PRINCIPAL WORK ITEMS:




  • 20304-2000 Removal of Bridge: 1 LPSM

  • 20401-0000 Roadway Excavation: 3,100 CUYD

  • 20401-0000 Roadway Excavation (Channel Excavation): 500 CUYD

  • 20441-0000 Waste: 2,300 SQFT

  • 30202-2000 Roadway Aggregate, Method 2: 750 TON

  • 40301-0100 Asphalt Concrete Pavement, Type 1: 535 TON

  • 50101-2600 Minor Concrete Pavement, Plain, 6-Inch Depth, 180 SQYD

  • 55201-0200 Structural Concrete, Class A (AE): 252 CUYD

  • 55302-1100 Precast, Prestressed Concrete Box Beam, Type B2-48: 448 LNFT

  • 55401-1000 Reinforcing Steel: 14,200 LB

  • 55401-2000 Reinforcing Steel, Epoxy-Coated: 18,500 LB

  • 55601-0900 Bridge Railing, Steel: 162 LNFT

  • 62801-000 Temporary Stream Diversion: LPSM



ANTICIPATED SCHEDULE:



Advertisement – October 2025



Award – December 2025



NTP – January 2026



Contract Completion – October 2026



Due to weather, no onsite work is anticipated between January and April 2026



ESTIMATED COST RANGE: Total estimated cost between $2,000,000 and $5,000,000.


Attachments/Links
Contact Information
Contracting Office Address
  • 12300 W. DAKOTA AVE
  • LAKEWOOD , CO 80228
  • USA
Primary Point of Contact
Secondary Point of Contact
History

Related Document

Sep 23, 2025[Presolicitation (Original)] AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT
Oct 20, 2025[Solicitation (Original)] AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT
Oct 28, 2025[Solicitation (Updated)] AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT
Nov 4, 2025[Solicitation (Updated)] AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT
Nov 17, 2025[Solicitation (Updated)] AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT
Nov 18, 2025[Solicitation (Updated)] AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT
Nov 19, 2025[Solicitation (Updated)] AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT
Jan 20, 2026[Solicitation (Updated)] AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow Davis-Monthan AFB Paving IDIQ Contract Active Contract Opportunity Notice ID FA487726B0001 Related

DEPT OF DEFENSE

Bid Due: 6/11/2026

Follow Prescott Replace Steam Boilers (Project No. 649-22-104) Active Contract Opportunity Notice ID

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 7/01/2026

Project ID: RFQ 26-001 Title: Construction Manager at Risk (CMAR) Highland High School

Gilbert Public Schools

Bid Due: 6/18/2026

Follow Y1EZ--Correct FCA Deficiencies Construction -Amendment Active Contract Opportunity Notice ID 36C77026R0006 Related

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 6/10/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.