| Location: | California |
|---|---|
| Posted: | Jun 3, 2026 |
| Due: | Jun 30, 2026 |
| Agency: | City of Monterey |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: CASS AND EL DORADO STREET CURB RAMP AND ROAD REHABILITATION (CIP2604C)
Addenda: 0
Release Date: 6/3/2026
Due Date: 6/30/2026
In general, the work consists of, but is not limited to, the demolition, earthwork, and construction for concrete curbs, gutters, sidewalks, driveways, ADA-compliant curb ramps, pavement, and storm drainage improvements. Pavement rehabilitation work includes milling, the placement of hot mix asphalt (HMA), rubberized hot mix asphalt (RHMA-G), stress absorbing membrane interlayer (SAMI), the application of pavement seal coats, and Class 2 Aggregate Base, per plan. Additional improvements include the installation of street lighting, electrical, permanent signage, striping, and curb painting, as well as the adjustment of utility structures to grade and the implementation of all required stormwater protection and traffic control measures.

With GovernmentContracts, you can:
...144102 - 144102 LIGHTING, EMERGENCY EQUIPMENT Status Stage Amended Posted 7/10/2026 Bid Due ...
City of Los Angeles
Bid Due: 7/24/2026
...Project Details ID: PW 04-14 Name: Energy Efficient Lighting Retrofit for Hall of ...
Napa County
Bid Due: 2/24/2205
...Bid 26-010 DO Lighting Project Bid Documents Victor Elementary School District BID NUMBER ...
Victor Elementary School District
Bid Due: 7/30/2026
...Pavement repair, drainage, MGS, Mod lighting systems and TMS.Details Event ID 04-1W7104 Format...
State Government of California
Bid Due: 8/04/2026