| Location: | California |
|---|---|
| Posted: | Jun 3, 2026 |
| Due: | Jun 30, 2026 |
| Agency: | City of Monterey |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: CASS AND EL DORADO STREET CURB RAMP AND ROAD REHABILITATION (CIP2604C)
Addenda: 0
Release Date: 6/3/2026
Due Date: 6/30/2026
In general, the work consists of, but is not limited to, the demolition, earthwork, and construction for concrete curbs, gutters, sidewalks, driveways, ADA-compliant curb ramps, pavement, and storm drainage improvements. Pavement rehabilitation work includes milling, the placement of hot mix asphalt (HMA), rubberized hot mix asphalt (RHMA-G), stress absorbing membrane interlayer (SAMI), the application of pavement seal coats, and Class 2 Aggregate Base, per plan. Additional improvements include the installation of street lighting, electrical, permanent signage, striping, and curb painting, as well as the adjustment of utility structures to grade and the implementation of all required stormwater protection and traffic control measures.

With GovernmentContracts, you can:
...321113: Sawmills Manufacturing 237130: Power and Communication Line and Related Structures Construction... Construction ...
City of Los Angeles
Bid Due: 6/30/2031
...Date: 7/30/2026 Follow On-Call Saw Cutting and Core Drilling Invitation for Bid- Construction ...
City of Palo Alto
Bid Due: 7/30/2026
...(SWPPP) measures. Construction shall include installation of underground utilities consisting of storm... Project: ...
Sutter County
Bid Due: 8/06/2026
...Method Type Construction Whole Item None Description To download, view, or print the ...
City of Los Angeles
Bid Due: 7/27/2026