Modesto 2026 Restroom Replacement

Location: California
Posted: Dec 10, 2025
Due: Jan 20, 2026
Agency: City of Modesto
Type of Government: State & Local
Category:
  • 99 - Miscellaneous
Publication URL: To access bid details, please log in.


Project ID:

Title: Modesto 2026 Restroom Replacement

Addenda: 0

Release Date: 12/9/2025

Due Date: 1/20/2026

Post Information
Posted At:Tue, Dec 9, 2025 3:35 PMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:No
Overview
Summary

The City of Modesto (City) is soliciting RFP/ RFQ for the Modesto 2026 Restroom Replacement for the City of Modesto. Submittals are due before 11am on January 20, 2026.

WHITMORE NEIGHBORHOOD PARK (1013 Bowen Ave, Modesto, CA 95350) – The current restroom building at this park is over 50 years old, is in poor condition, and in need of replacing. The restroom building shall be removed in its entirety and will be replaced with an all-new pre-manufactured building, including making any new water, electrical, and sewer utility connections required. Existing concrete to be either removed in favor or landscape area or repaired where applicable. There is an irrigation controller and minimal electrical in the existing building that will need to be accommodated for in the design. This project will likely require a civil engineer, electrical engineer, geotechnical engineer, landscape architect, and surveyor to complete a comprehensive construction bid package.

Background

Emphasis on value engineering, simplicity, and quality design is critical to the success of this project. The project will require an experienced full service consultant (team) with the ability to evaluate the existing conditions and make recommendations in a wide range of design services including but not limited to: civil engineering, electrical engineering, landscape architectural, surveying and geotechnical specialists. The consultant selected will need to be familiar with all applicable adopted local building codes (City of Modesto), City of Modesto Park Design Standards, the existing project concept layouts attached.

Timeline
RFP/RFQ Posted:
December 9, 2025
Requests for Clarifications, Corrections or Modifications:
January 6, 2026, 11:00am
Proposals/Statement of Qualifications Due:
January 20, 2026, 11:00am
Committee Review Complete *:
February, 2026
Consultant Interview, if needed *:
TBD
Notice to Proceed *:
April, 2026
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Concept Design (CCD), Feasibility studies; Concept/Schematic Design Drawings, and other Advanced... (RDS) - ...

DEPT OF DEFENSE

Bid Due: 6/16/2026

...California Energy Code compliance evaluation program, including the design and execution... concepts, workforce-related ...

California Energy Commission

Bid Due: 7/14/2026

...on a long-term ground lease basis after Concept Plans for site redevelopment are ...

City of Morro Bay

Bid Due: 9/30/2026

...program, including the design and execution of methodologically defensible evaluations to address..., including ...

State Government of California

Bid Due: 7/14/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.