Y1DA--528A6-26-611 Abate Asbestos Pipe Insulation - B76

Location: Federal
Posted: Dec 10, 2025
Due: Dec 17, 2025
Agency: VETERANS AFFAIRS, DEPARTMENT OF
Type of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: 36C24226B0021
Publication URL: To access bid details, please log in.
Follow
Y1DA--528A6-26-611 Abate Asbestos Pipe Insulation - B76
Active
Contract Opportunity
Notice ID
36C24226B0021
Related Notice
36C24226B0021
Department/Ind. Agency
VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
242-NETWORK CONTRACT OFFICE 02 (36C242)
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Dec 10, 2025 04:35 pm EST
  • Original Published Date: Nov 21, 2025 05:37 pm EST
  • Updated Date Offers Due: Dec 17, 2025 12:30 pm EST
  • Original Date Offers Due: Dec 17, 2025 12:30 pm EST
  • Inactive Policy: Manual
  • Updated Inactive Date: Feb 15, 2026
  • Original Inactive Date: Feb 15, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Y1DA - CONSTRUCTION OF HOSPITALS AND INFIRMARIES
  • NAICS Code:
    • 562910 - Remediation Services
  • Place of Performance:
Description View Changes

Abate Asbestos Pipe Insulation – B76



528A6-26-611



GENERAL PROJECT WORK SCOPE DESCRIPTION



Existing Conditions:



The Bath VAMC is located at 76 Veterans Avenue, Bath, NY 14810. The layout is a campus



with more than 30 buildings located on over 200 acres. Normal working hours are Monday – Friday



8:00am – 4:30pm. The Scope of this project includes but is not limited to the abatement of ACM



pipe insulation found within Building 76. Contactor shall follow all requirements and procedures set



by the local, state, and federal rule, regulation, and guidelines for the proper removal and disposal of



ACM. Building 76 being a fully operational Medical Center may restrict the hours of work and may



require off-tour work to ensure continuous operations of the facility as directed by the COR.



Contractor shall have 30 days from the “Notice to Proceed” to complete all work.



Scope of Work:



1. Demolition:



a. Contractor is to provide all labor, material, equipment, supervision, to complete the



removal of approximately 200 LF of ACM insulation found on existing plumbing



from the crawl space and runs vertically through to the 2nd floor. Contractor is



required to dispose of all ACM at an approved location offsite. Clear exposure/wall



removal is to be completed by Medical Center maintenance shops prior to the start of



the abatement.



b. Part of scheduled abatement work is within basement/crawl space which is



considered a confined space.



2. Safety Measures:



a. Review and incorporate risk assessment and interim life safety plans and measures



into safety and construction planning.



i. Pre Construction Risk Analysis (PCRA) by VA



ii. Interim Life Safety Measures (ILSM) by VA



b. Generate and follow a safety plan and incorporate risk and life safety assessments.



3. Communication and Standards



a. All contract direction, changes, financials, and contract performance are the



responsibility of the VAMC Contracting Officer (CO).



b. Contracting Officers Technical Representative (COR) is responsible for the day-today



operations in project and the primary point of contact (POC) for the project.



i. Communications to/from VAMC



ii. Technical communications, submittals, RFI’s, change orders



iii. On site visits for construction and sub-contractors



iv. Construction coordination



c. Project is required to use Autodesk Construction Cloud Build Platform (ACC)



i. Bath VAMC will provide licensing, permissions, and online training for this



cloud-based tool at no cost to the contractors.



ii. Contractors are required to actively use Build on ACC for project



documentation and coordination.



iii. ACC is used for submittals, RFI’s, project communications and



documentation.



1. No contract financial information on ACC.



2. No personal identification information on ACC.



Code requirements:



The installed product must, at a minimum, be in accordance with all applicable codes



including Veterans Affairs standards which can be found at https://www.cfm.va.gov/til/. This will



include, but not be limited to: Department of Veterans Affairs Design Manuals, VA Publications,



and Construction Standards, National Fire Protection Code (NFPA), Life Safety Code, Underwriters



Laboratory (UL), International Building Code IBC, National Electric Code (NEC), the VA



Information Security Handbook 6500.6, Occupational Health and Safety (OSHA), and



Environmental Protection Agency (EPA) requirements (to include Mold Remediation in Schools and



Commercial Buildings). All work will be completed by certified individuals.



Contract Drawings: Please see attached.



Specifications: Please see attached.



General Requirements:



A. The contractor shall review the contract documents for conflicts. Where conflicts exist work



shall not proceed until the COR has been notified and has given direction.



B. Where incidental work is required to accomplish work shown on the drawings, this work is



implied and shall be included as part of the base bid.



C. Prior to any work commencing in an area, the contractor shall notify the COR of his intention to



work in the area and shall schedule a walkthrough with the COR to determine existing



conditions.



D. After the work, the existing work areas shall be returned to their original state before final



approval shall be given. After the completion of construction, the contractor shall completely



clean all surfaces of construction debris.



E. The contractor shall receive all deliveries of materials, equipment, tools, or other goods off



station, and bring them to the job site. The Bath VA shall not accept deliveries for project



purposes.



F. The contractor shall prepare and submit an excel spreadsheet submittal log listing all submittals



required. The worksheet shall be submitted by the contractor and reviewed and re-submitted as



necessary.



G. The contractor shall not proceed with any on-site work until the completion of the submittal



process or approval to proceed from the CO and COR without completion of the submittal



process. Not less than 14 calendar days shall be planned for COR review of each submittal. Resubmittals



shall be provided as required by the COR, and shall be treated as a new, separate



submittal.



H. Any non-lead time materials will only be paid for when installed.



I. Any items identified as punch list items will be fixed prior to project closeout.



J. Special care will be taken to secure tools and construction equipment during construction as this



facility has patients in it.



K. Work cleanliness must be adhered to throughout the project.



L. Sounds and vibrations must be kept to a minimum to avoid patient disruption. The COR



reserves the right to stop work if sound and vibrations are impacting patient living or employees.



M. Contractor staging area is east of railroad tracks, coordinate with COR.



N. Off tour work may be required to minimize the impact on Veterans and employees.



O. The contractor shall warranty all work including for 1 year from the date of acceptance.



Warranty shall include any labor or parts necessary to ensure complete functionality of the new



area.



P. The contractor shall plan accordingly to stage and store materials in the contractor’s designated



area shown.



Q. The contractor shall be responsible for coordinating any traffic interruption with the COR. The



contractor is responsible for providing interior pedestrian traffic control as well as any exterior



traffic control personnel as needed during the period of the performance.



Submittals:



Submittals are required for all items outlined in the specification and include but are not



limited to the submittals as shown in the submittal log.



Project Duration:



The total project duration for this project is not to exceed 30 days from the date of the NTP



issuance. This includes all processes starting with submission and approval of all submittals and



ending with final punch list c


Attachments/Links
Contact Information
Contracting Office Address
  • 113 HOLLAND AVE
  • ALBANY , NY 12208
  • USA
Primary Point of Contact
Secondary Point of Contact


History

Related Document

Nov 21, 2025[Presolicitation (Original)] Y1DA--528A6-26-611 Abate Asbestos Pipe Insulation - B76
Nov 21, 2025[Solicitation (Original)] Y1DA--528A6-26-611 Abate Asbestos Pipe Insulation - B76
Nov 28, 2025[Solicitation (Updated)] Y1DA--528A6-26-611 Abate Asbestos Pipe Insulation - B76
Dec 11, 2025[Solicitation (Updated)] Y1DA--528A6-26-611 Abate Asbestos Pipe Insulation - B76
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow Y--VOYA 335009 N191 REHAB RAINY AND ASH Active Contract Opportunity Notice ID

INTERIOR, DEPARTMENT OF THE

Bid Due: 6/09/2026

Follow 20--CYLINDER,DUPLEX Active Contract Opportunity Notice ID N0010426QYA76 Related Notice Department/Ind. Agency DEPT

DEPT OF DEFENSE

Bid Due: 7/31/2026

Follow F--Snake River Area Office Weed Control Active Contract Opportunity Notice ID 140R1726Q0025

INTERIOR, DEPARTMENT OF THE

Bid Due: 6/12/2026

Follow Z1DA--646-21-101 UD SPS AHU & RO Upgrade (VA-26-00036217) Active Contract Opportunity Notice

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 6/11/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.