| Location: | Florida |
|---|---|
| Posted: | Sep 25, 2025 |
| Due: | Oct 14, 2025 |
| Agency: | Kissimmee Utility Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB 25-072-JG |
| Publication URL: | To access bid details, please log in. |
| Date | Time | Mandatory | Location |
| Date | Time | Location |
| # | Required | Group | Make | Model | Description | Quantity | Unit of Measure | Price/ Percent | Type |
| Question | Date Asked | Answer | Date Answered |
| Is there an anticipated delivery need date for this material? | 9/11/2025 12:12:27 PM | July 1, 2026 | 9/16/2025 5:54:15 PM |
|
Could you please accept our company MVA POWER as approved manufacturer-Supplier For Steel poles Structures .
Our Plant located in Shanghai China. we are already supply many project of Tubular Steel Structures and Standard Steel Structures to many District and PUD in USA . Thank you |
9/17/2025 2:56:31 PM | Approved Manufacturers – The manufacturing plant for all poles and structures delivered must be located within the USMCA region. Suppliers or manufacturers that cannot meet this requirement are not approved for use. | 9/19/2025 1:15:04 PM |
|
Please provide Back files and Lca. for this request.
thank you |
9/18/2025 8:39:37 AM | The supporting background documents and the load calculation analysis can be found in the PDF file titled “IFB 25-072-JG Transmission & Substation Structures for Van Meter Substation”, specifically in Exhibit B, Section 3 – Specifications (pages 46–83). | 9/19/2025 1:15:24 PM |
|
Good morning
please provide Back files & Lca. for this request thank you |
9/19/2025 8:11:08 AM | The supporting background documents and the load calculation analysis can be found in the PDF file titled “IFB 25-072-JG Transmission & Substation Structures for Van Meter Substation”, specifically in Exhibit B, Section 3 – Specifications (pages 46–83). | 9/19/2025 1:15:38 PM |
| In the drawing "22-S-1021", there is only one Lightning Mast. It looks like LM1-LM6 is going to be the same Lightning Mast with different span . Can you verify with the client if we can design the Lightning mast with controlling/max span cases and quantity of 6? | 9/24/2025 8:16:32 AM | There is no wire between the lightning masts. As seen on drawing 22-S1021, we will instead be using Spline Ball Ionizers. Quantity of six lightning masts and quantity of one termination structure as can be seen on the General Arrangement drawing 22-E-1000. | 9/25/2025 4:48:14 PM |
| Can the bid be extended one week to 10/14? | 9/25/2025 2:49:24 PM | Yes, KUA has extended the bid due date to Tuesday, October 14, 2025. | 9/25/2025 4:47:41 PM |
| Code | Description |
| [285-84] | Transformers, Transmission Line Type |
| [839-60] | Poles, High Voltage Transmission |
| [925-78] | Power Generation, Transmission, Distribution - Engineering |
| [936-77] | Substation/High Voltage (Electrical) Maintenance and Repair |
| [285-3] | Arresters, Lightning |
| [839-60] | Poles, High Voltage Transmission |
| [285-74] | Pole Line Hardware: Anchors, Arms, Bolts, Braces, Brackets, Clevises, Connections, Insulators, Plates, Pole Steps, Racks, Rods, Shackles, Straps, Thimbles, Washers, etc. (See 765-95 for Wire Rope Accessories) |
| Publication | Date |

With GovernmentContracts, you can:
...Samuels Title Transformers Life Extension Services RFP Secondary Contact Number RFP# 2026-210... Solicitation ...
Polk County Public Schools Facilities and Operations
Bid Due: 6/18/2026
...Submissions Yes Project Estimate Piggyback Solicitation No Insurance Required Yes Bid Bond Required... ...
Brevard County School Board
Bid Due: 6/30/2026
...Submissions Yes Project Estimate Piggyback Solicitation No Insurance Required Yes Bid Bond Required... ...
Polk County Public Schools Facilities and Operations
Bid Due: 6/30/2026
...Solicitation No Insurance Required Yes Bid Bond Required No Bid Bond Amount Performance ...
Polk County Public Schools Facilities and Operations
Bid Due: 6/16/2026