| Location: | California |
|---|---|
| Posted: | Mar 31, 2025 |
| Due: | Apr 11, 2025 |
| Agency: | HOMELAND SECURITY, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 11702PR250000267 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Scope of work for Powder Coating of Hatches and Stanchions
PR 11702PR250000267
Purpose and objective:
CGC WAESCHE seeks to purchase powder coating for hatches and stanchions for the purpose of corrosion prevention and maintenance.
Scope: The following are the dimensions and items that need the powder coating.
Foc’sule- 02 QAWTD
01-28-3, 1-28-1
QAWTD
Length- 66”
Width- 2FT 2IN
Exterior White
Foc’sule- 02 Total Scuttles
01-22-2
Diameter- 1FT 9IN
Exterior White
Turtle Backs- 2 Total
Chain Locker
Length- 3FT 11IN
Width- 2FT 2IN
Tear Drop Hawspipe- 2 Total
Length- 2FT 1.5IN
Width- 2FT
Macaroni Hawspipe- 2 Total
Length- 2FT 11IN
Width- 1FT 10IN
Scuttle For Mooring Line Stowage, Fantail- 2 Total
Diameter- 1FT 3IN
Fantail Stanchion- 13 Total
Length-3FT 9IN
Width-2IN
Short Stanchion- 3 Total
Length-11FT 9IN
Width-2IN
Boat Cradle- 16 Total
Length 3FT 1IN
Width 4.5IN
FAS Stanchion- 2 Total
Length-3FT 6.5IN
Width- 2IN
Foc’sle Stanchion- /14 Total
Length-3FT 9IN
Width- 2 inch
Anchor Windless Stanchion- /25 Total
Length-3FT 9 IN
Width-2 IN
Exhaust Fan Cover- 1-15-1 /2 Total
Inboard
Length- 16 3/4IN
Width- 16 ¾ IN
Outboard Cover
Length- 31 3/4 IN
Width- 17 ¾ IN
Exhaust Fan Cover 1-14-2 /1 Total
Length- 27 ½IN
Width- 16 1/2 IN
Exhaust Fan Cover 1-15-2 /1 Total
Length- 45 3/4IN
Width- 17 3/4IN
1-27-2/ 3 Total
Length- 25 3/4IN
Width- 25 3/4IN
Flight Deck Vent Grate- Centerline
Length- 19 IN
Width- 52 IN
The contractor shall:

With GovernmentContracts, you can:
...locker room and shower areas, revised plumbing systems, and associated improvements. Work also...
City of Benicia
Bid Due: 6/30/2026
..., while the south section rises two stories above grade. The venue also ...
UCLA Capital Programs
Bid Due: 6/16/2026