Project Description: Sealed bids for replacing an existing concrete pipe with an HDPE pipe and bank stabilization, including the installation of retaining walls and two new headwalls, will be received online via the PennBid Program (https://pennbid.bonfirehub.com) by Upper Allen Township, Cumberland County, Pennsylvania, until
10:00 AM, Friday, March 13, 2026.
The bids will be publicly opened and read electronically, via PennBid’s website, at 10:00 AM (prevailing time), same date. Bid results will be available end of business day, same date.
Copies of Bidding Documents for Bumble Bee Hollow Road Bank Stabilization & Culvert Replacement are available online and at no cost via the PennBid Program at https://pennbid.bonfirehub.com.
NOTE: The Board of Commissioners of Upper Allen Township have authorized C.S. Davidson, Inc., to act on their behalf by opening bids. Contracts will be awarded at a regularly scheduled meeting of Upper Allen Township.
A bid bond by acceptable surety or a certified check made payable to Upper Allen Township in the amount of 10% of the maximum bid must be provided by each bidder with their bid.
Each bidder must be prepared to submit evidence of his qualifications to perform the work.
Notice is hereby given to bidders that this project is subject to the provisions of the Pennsylvania Prevailing Wage Act approved August 15, 1961 (Act No. 442, P.L. 987), as amended.
The Contract Time for this project is ninety (90) calendar days.
Upper Allen Township reserves the right to accept any bid or reject any or all bids.
Upper Allen Township
Keldeen Stambaugh, Manager

With GovernmentContracts, you can:
..., including pipe cleaning, CCTV inspection, bypass pumping, liner installation, traffic control, restoration, ...
PennBid
Bid Due: 6/11/2026
.... The project consists of the installation of 18-inch High-Density Polyethylene (HDPE) storm ...
PennBid
Bid Due: 6/17/2026
...of aeration fan, piping, pipe supports, valves, instruments and aeration trench components. * ...
PennBid
Bid Due: 6/19/2026
...purchase and installation of temporary erosion and sediment control measures per the approved ...
PennBid
Bid Due: 6/12/2026