Yellowtail Switchyard DCS Ph I Pre-Fab Bldg/Const
| Location: |
Federal |
| Posted: |
Jun 18, 2025 |
| Due: |
Aug 8, 2025 |
| Agency: |
ENERGY, DEPARTMENT OF |
| Type of Government: |
Federal |
| Category: |
- Y - Construction of Structures and Facilities
|
| Solicitation No: |
89503225BWA000069 |
| Publication URL: |
To access bid details, please log in. |
Yellowtail Switchyard DCS Ph I Pre-Fab Bldg/Const
Active
Contract Opportunity
Notice ID
89503225BWA000069
Related Notice
89503225BWA000069
Department/Ind. Agency
ENERGY, DEPARTMENT OF
Sub-tier
ENERGY, DEPARTMENT OF
Office
WESTERN-ROCKY MOUNTAIN REGION
Looking for contract opportunity help?
General Information
-
Contract Opportunity Type: Solicitation (Original)
-
Original Published Date: Jun 18, 2025 02:29 pm MDT
-
Original Date Offers Due: Aug 08, 2025 02:00 pm MDT
-
Inactive Policy: 15 days after date offers due
-
Original Inactive Date:
Aug 23, 2025
-
Initiative:
Classification
-
Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
-
Product Service Code: Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
-
NAICS Code:
-
237130 - Power and Communication Line and Related Structures Construction
-
Place of Performance:
Description
Yellowtail Switchyard DCS Phase I priniciple components of work include demolishing of existing building, providing a new pre-fabricated building, complying with all applicable safety requirements contained in WAPA's Construction Standard 1 and OSHA Standards, replacing five (5) 230-kV power circuit breakers including their concrete foundations, rotating six (6) 115-kV power circuit breakers 180 degrees, replacing four (4) 115-kV power circuit breaker concrete foundations, removing six (6) pothead steel structures, removing two (2) disconnect switches (steel only), removing eighteen (18) bus poles and their foundations, removing two (2) lighting units and their foundations, removing two (2) disconnect switches and their foundations, removing one (1) 230-kV power circuit breaker and its foundation, removing two (2) single platforms, removing one (1) double platform, installing one (1) bus pole and its foundation, replacing twelve (12) 230-kV disconnecting switches, replacing two (2) 230-kV disconnecting switches with ground blades, installing one (1) 230-kV CCVT and its foundation, installing a prefabricated control building and associated equipment, material and foundations.
Attachments/Links
Contact Information
Contracting Office Address
-
5555 E. CROSSROADS BLVD
-
LOVELAND , CO 80538
-
USA
Secondary Point of Contact
History
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...Mountain Region (RMR) is proposing to upgrade 35 miles of its Lusk Rural ...
ENERGY, DEPARTMENT OF
Bid Due: 7/24/2026
...Lusk Rural Tap-Glendo (LRT- GLD) 69-kV transmission line to a 115-kV transmission line ...
ENERGY, DEPARTMENT OF
Bid Due: 7/03/2026
...PROJECT (LIBERTY - LONE BUTTE, LIBERTY - PHOENIX 230-kV TRANSMISSION LINE) Attachments/Links Contact...
ENERGY, DEPARTMENT OF
Bid Due: 6/12/2026
...and Related Structures Construction Place of Performance: Description North Gunnison 115-kV Switch...
ENERGY, DEPARTMENT OF
Bid Due: 7/06/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.