| Location: | South Carolina |
|---|---|
| Posted: | Mar 26, 2026 |
| Due: | May 27, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Hilton Head Public Service District ("Utility") is requesting proposals from qualified architectural/engineering firms ("Consultant") to provide a feasibility study, conceptual design, and cost-benefit analysis for the reconfiguration of site buildings at its Wastewater Treatment Plant (WWTP) located at 21 Oak Park Dr, Hilton Head Island, SC 29926, including an evaluation of its current chiller system.

With GovernmentContracts, you can:
...firms for Architectural Design Professional Services under an Indefinite Quantity Contract (IDQ...: May ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 5/22/2027
...selected firm will provide architectural and engineering (A/E) design services . Construction... Project ...
Beaufort County
Bid Due: 7/01/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: $200,000 to $265,000 Prime Contractor License... irrigation, ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/16/2026
...is soliciting qualifications from qualified design professionals to provide architectural and engineering... Project ...
Beaufort County
Bid Due: 6/30/2026