SYNOPSIS OF PROPOSED CONTRACT ACTION
LOCK AND DAM 24 SERVICE BRIDGE AND TAINTER GATE REHAB (PIER REHAB)
CLARKSVILLE, MO
DATE: 8 October 2025
CONTRACTING OFFICE ADDRESS: 1222 Spruce Street, St. Louis, MO 63104
POINT OF CONTACT: Whitney Dee, Contract Specialist, whitney.r.dee@usace.army.mil
CONTRACT NUMBER: W912P924D0001
PLACE OF CONTRACT PERFORMANCE: Clarksville, MO
COMPETITION SET-ASIDE: Sole Source
CONTRACTOR: OCCI, Inc. (SAM UEI: EARTRNJ1ZFW6)
PROPOSED CONTRACT ACTION: Contract modification to increase capacity by $50,000,000 from $75,000,000 to $125,000,000.
PRODUCT SERVICE CODE: Y1KA – Construction of Dams
NAICS AND SIZE STANDARD: The North American Industry Classification System (NAICS) code for this is effort is 237990, Other Heavy and Civil Engineering Construction. The Small Business size standard is $45 million.
DESCRIPTION:
The U. S. Army Corps of Engineers, St. Louis District (MVS), has an existing Lock & Dam 24 (LD 24) Pier Rehab Firm-Fixed-Price Indefinite Delivery, Indefinite Quantity (IDIQ) Single Award Task Order Contract (SATOC) No. W912P924D0001 that was awarded to OCCI, Inc. with a capacity of $75M on 19 January 2024. The scope of work requires construction services to complete repairs to seven (7) piers, fifteen (15) Tainter gates (TG), and a service bridge on LD 24. MVS is pursuing the approval of a $50,000,000 Justification and Approval (J&A) for additional repairs necessary due to catastrophic chain failure at TG 14, an allision at TG 9, and additional latent damage only discoverable once work began.
All responsible sources may submit a capability statement, proposal, or quotation, which shall be considered by the agency.

With GovernmentContracts, you can:
US-56 Corridor Management Project (2026) - Baldwin City, KS 16-1308 StatusAccepting Bids Bid
Drexel Technologies
Bid Due: 9/30/2026
2026 Flood Buyout Program Professional Demolition/Land Clearance Services and Asbestos Abatement StatusAccepting Bids
Drexel Technologies
Bid Due: 10/02/2026
Western Transmission Main Phase 3C - St. Charles County, MO 22-007 StatusAccepting Bids
Drexel Technologies
Bid Due: 10/15/2026
*THIS IS A SUBCONTRACTING OPPORTUNITY* ETR/EXCELSIOR SPRINGS JOB CORPS 701 ST. LOUIS AVE.
Excelsior Springs Job Corps
Bid Due: 10/01/2026