| Location: | California |
|---|---|
| Posted: | Oct 8, 2026 |
| Due: | Oct 22, 2026 |
| Agency: | City of Stockton |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PUR 27-016 |
| Publication URL: | To access bid details, please log in. |
| General Information | |
| Due Date: | October 22, 2026 |
| Opening Time: | 2:00 PM PST |
| Published Date: | October 8, 2026 |
| Last Updated: | October 8, 2026 |
| Bid Orientation: | Informal Request for Proposals |
| Solicitation Number: | PUR 27-016 |
| Description: | On-Call Oil Water Separator (OWS) Clean Out Services |
| Solicitation Stage: | Accepting Proposals |
| Procurement Contact | |||
| Name: | Role: | Phone Number: | Email: |
| Timothy Caluya | Procurement Specialist | (209) 937-8357 | stocktonbids@stocktonca.gov |
| Specifications | |
| Document: | Request for Proposals |
| Addendum and Statement Clarifications | |
| Document: | There is currently no Addendum or Statement of Clarification |
Administrative Services Department
501 W. Weber Ave. Stockton, CA 95203 209-937-8357 www.stocktonca.gov
INFORMAL REQUEST FOR PROPOSALS (IRFP) FOR
ON-CALL OIL WATER SEPARATOR (OWS) CLEAN OUT
SERVICES
PUR 27-016
IRFP CLOSES time 2:00 PM, October 22, 2026
Date of Release: October 8, 2026
Deadline: 2:00 PM PST, October 22, 2026
Contacts: Timothy Caluya, Procurement Specialist
stocktonbids@stocktonca.gov
209-937-8357
INFORMAL REQUEST FOR PROPOSAL (IRFP)
The City of Stockton ("City") is seeking, via an informal request process, proposals for On-Call Oil
Water Separator (OWS) Clean Out Services at various Stockton Fire Department ("Department")
Fire Stations. Proposals will be reviewed, and specifications may be amended to meet City goals.
INTRODUCTION
The City is seeking proposals from qualified Contractors to provide as-needed oil-water separator
clean-out services at various City Fire Department facilities.
The selected Contractor shall provide all labor, equipment, materials, transportation, disposal, and
other resources necessary to properly service and clean the City's oil-water separator systems.
Services will be performed on an as-needed basis, with the timing and frequency of service
determined by the individual needs and conditions of each oil-water separator.
IRFP DEADLINE
Proposals must be received no later than 2:00PM PST on October 22, 2026. Proposals received
after this date will not be considered for review. The proposal must be signed by a person legally
authorized to bind the Proposer to a contract should the proposal be qualified and certified for
contract and execution of work. All proposals must be submitted in PDF form to
stocktonbids@stocktonca.gov.
SCOPE OF SERVICES
Please see Exhibit A for complete Scope of Services.
PROPOSAL CONTENT
Proposal Guidelines, Content and Format: The City of Stockton uses a qualifications-based
selection process in obtaining these services. In order for the City to properly evaluate the
Proposers' qualification to perform this work, the proposals shall include, as a minimum, the following
information:
A. Evidence of the Proposer's ability to be responsive to this project in regard to
timeliness and expertise, including availability of staff proposed to be assigned.
B. The Proposers are encouraged to expand on the Scope of Services (Exhibit A) to
demonstrate their expertise. Evaluation of the proposals will be based on
qualifications, the experience of staff proposed to be assigned to the project,
references and thoroughness of the proposer's response to the Scope of Services.
C. Such additional information that the Proposer may feel would be pertinent to assist
the City of Stockton in making its final decision.
D. Please email your proposal to Timothy Caluya with the subject of email titled PUR 27-
016 On-Call Oil Water Separator (OWS) Clean Out Services. Proposals must be
received at this email address no later than 2:00PM PST on October 22, 2026.
Proposals received after this date will not be considered for review. The proposal must
be signed by a person legally authorized to bind the Proposer to a contract should the
Proposal be qualified and certified for contract and execution of work.
The IRFP must include the following:
1. Cover Letter: Submit a letter on your company letterhead addressing the proposal and format.
The letter should be signed by an officer of the firm authorized to bind the firm to all comments
made in the proposal, and shall include the name, address, phone number and e-mail
address of the person(s) to contact who will be authorized to represent your firm.
2. Minimum Experience Qualifications Summary: Please provide a profile of consultant/firm
which includes:
List of the names and title of the members, partners, officers, management, and staff of the
consultant's firm.
* Resumes of key individuals associated with this proposed examination.
* If subconsultant(s) will be used, please include resume and qualifications of the
subconsultant.
* A minimum of three references for which the consultant has provided comparable
contractual services to those specified in the IRFP along with the subconsultant and
contacts where applicable.
* A summary and samples of work on similar projects.
3. Work Plan/Timeline: Provide a work plan that incorporates the scope of services outlined
above. The work plan should generally identify the expected duration of each task and
reflect associated personnel and other resources required for all tasks to be performed.
This should include a schedule for all deliverables. On-site and off-site time should be
separately stated. There should be a clear explanation of consultant's and City
responsibilities.
4. Project Fees and Fee Schedule: Provide a comprehensive budget and fee schedule.
This fee schedule should include costs for all services required in this IRFP. Pricing
should identify any applicable:
* Per-service or per-separator charge;
* Mobilization or trip charge;
* Disposal or waste-handling charge;
* Additional labor or equipment charges; and
* Other fees necessary to complete the requested service.
5. Project Scope of Services: Clearly define how you will meet the objectives and
requirements of the scope of services in detail. Proposers are encouraged to expand
on the Scope of Services to demonstrate their expertise. Evaluation of the
proposals will be based on qualifications, the experience of staff proposed to be
assigned to the project, references and thoroughness of the proposer's response to the
Scope of Services.
6. Insurance & Contract Requirements: Provide a statement that you have reviewed and
agree to the insurance requirements specified in Exhibit B and the terms and conditions
specified in Exhibit C. Provide a sample completed Insurance Certificate according to
terms as identified in Exhibit B to show you are able to provide insurance if awarded this
contract. Final insurance certificates must be provided before contract can be approved.
INDEMNITY AND HOLD HARMLESS
To the fullest extent permitted by law, Contractor shall hold harmless, defend and indemnify City of
Stockton and its officers, officials, employees and volunteers from and against any and all liability,
loss, damage, expense, costs (including without limitation costs and fees of litigation) of every
nature arising out of or in connection with Contractor's performance of work hereunder or its failure
to comply with any of its obligations contained in this agreement, except such loss or damage which
was caused by the sole negligence or willful misconduct of the City of Stockton. This obligation is
independent of, and shall not in any way be limited by, the minimum insurance obligations contained
in this agreement. These obligations shall survive the completion or termination of this agreement.
SELECTION AND AWARD
Award will be made based on the most advantageous proposals to the City with the proper
credentials and best experience/professional standards. The City reserves the right to select the
successful proposer and negotiate terms of a contract with the proposer whose proposal is most
responsive to the needs of the City. Further, the City reserves the right to reject any and all
proposals, or alternate proposals, or waive any informality in the proposal as is in the City's best
interest. Staff will determine how well the IRFP meets the needs of the City in terms of suitability of
services, experience, and cost will not be the primary factor. Proposals are subject to final
negotiation. If no proposals are accepted, the City reserves the right to cancel this IRFP and release
a new IRFP.
TERM
The City and Proposer will sign an agreement for three years on an as-needed, not-to-exceed basis.
QUESTIONS AND ADDENDA
Questions regarding this IRFP are to be directed by email to Administrative Services Department -
Procurement Division No later than October 15, 2026 by 2:00 PM. Material changes, if any, to the
scope of services or proposal procedures will be transmitted by email.
In the event that it becomes necessary to revise any part of this IRFP, an addendum will be
issued on the City's BidFlash page.
| Station | Address |
|---|---|
| Fire Station 1 | 1818 S. Fresno Ave., Stockton, CA 95206 |
| Fire Station 4 | 5225 Pacific Ave., Stockton, CA 95207 |
| Fire Station 5 | 3449 Manthey Rd., Stockton, CA 95206 |
| Fire Station 7 | 1767 W. Hammer Ln., Stockton, CA 95209 |
| Fire Station 10 | 2903 W. March Ln., Stockton, CA 95219 |
| Fire Station 11 | 1211 E. Swain Rd., Stockton, CA 95210 |
| Fire Station 14 | 3019 McNabb St., Stockton, CA 95209 |
EXHIBIT A
SCOPE OF SERVICES
The City currently has seven (7) oil-water separator systems located at the following Fire Department
stations:
Station Address
Fire Station 1 1818 S. Fresno Ave., Stockton, CA 95206
Fire Station 4 5225 Pacific Ave., Stockton, CA 95207
Fire Station 5 3449 Manthey Rd., Stockton, CA 95206
Fire Station 7 1767 W. Hammer Ln., Stockton, CA 95209
Fire Station 10 2903 W. March Ln., Stockton, CA 95219
Fire Station 11 1211 E. Swain Rd., Stockton, CA 95210
Fire Station 14 3019 McNabb St., Stockton, CA 95209
Services will be requested and scheduled by the City on an as-needed basis. The City will determine
when a separator requires service based on its individual condition, accumulation of material,
operational needs, inspection findings, and other factors.
The frequency of service may vary among the seven (7) locations. Some separators may require
service multiple times during a year, while others may require service less frequently.
The City does not guarantee a minimum number of service requests, service frequency, or
expenditure during the Agreement term.
DELIVERABLES
Cleaning of the Oil Water Separator (OWS)
Upon request by the City, the Contractor shall provide the following services, but not limited to:
1. Coordinate and schedule service with the City's designated representative.
2. Mobilize appropriate personnel, equipment, and vehicles to the designated Fire Department
facility.
3. Access and service the designated oil-water separator.
4. Vacuum and remove accumulated oil, water, sludge, sediment, debris, and other material from
the separator.
5. Clean the separator to the extent reasonably necessary to restore it to an appropriate operating
condition.
6. Remove all collected material from the City facility.
7. Transport removed material in accordance with applicable laws and regulations.
8. Properly dispose of, recycle, or otherwise manage removed materials at an authorized facility.
9. Clean the immediate work area upon completion of the service.
10. Notify the City of any observed damage, deficiencies, unusual conditions, or other issues
affecting the separator.
11. Provide documentation (service report) of the work performed following each service, including
at a minimum:
* Fire Station/location;
* Date of service;
* Oil-water separator serviced;
* Description of services performed;
* Approximate quantity of material removed, if available;
* Disposal, recycling, or treatment information;
* Any deficiencies or unusual conditions observed; and
* Recommendations for future service, if applicable.
The Contractor shall use equipment, and methods appropriate for the specific separator being
serviced.
Waste Handling and Disposal
The Contractor shall be responsible for the proper handling, transportation, treatment, recycling,
and/or disposal of all materials removed from the City's oil-water separator systems.
The Contractor shall comply with all applicable federal, State of California, and local requirements
governing the handling, transportation, and disposal of recovered materials and waste.
Upon request, the Contractor shall provide the City with documentation demonstrating the proper
disposal, recycling, or treatment of materials removed during service.
Additional Work
If the Contractor determines that additional work beyond the requested clean-out service is
necessary, the Contractor shall notify the City before performing such work. Additional work may
include repairs, replacement of components, or other services not included within the requested
clean-out.
The Contractor shall provide a separate quotation for any proposed additional work when requested
by the City.
The Contractor shall not perform additional billable work without prior authorization from the City.
CONTRACTOR RESPOSIBILITES
The Contractor shall furnish all labor, supervision, equipment, tools, vehicles, materials, personal
protective equipment, and other resources necessary to perform the services.
The Contractor shall:
* Maintain all equipment in safe and operable condition;
* Ensure personnel performing the work are properly trained and qualified;
* Follow applicable Fire Department safety and access requirements;
* Take reasonable precautions to prevent spills, releases, and property damage;
* Maintain a clean and orderly work area; and
* Promptly notify the City of any spill, release, damage, or other condition requiring City
attention.
EXHIBIT B
INSURANCE REQUIREMENTS
Insurance Requirements for Environmental Contractors and/or Consultants
Contractor shall procure and maintain for the duration of the contract insurance against claims for
injuries to persons or damage to property which may arise from or in connection with the performance
of the work hereunder and the results of that work by the Contractor, his agents, representatives,
employees, or subcontractors. With respect to General Liability, Errors & Omissions, Contractors
Pollution Liability, and/or Asbestos Pollution Liability, coverage should be maintained for a minimum
of five (5) years after contract completion.
MINIMUM SCOPE AND LIMIT OF INSURANCE
Coverage shall be at least as broad as:
1. Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering
CGL on an "occurrence" basis, including products and completed operations, property damage,
bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a
general aggregate limit applies, either the general aggregate limit shall apply separately to this
project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required
occurrence limit.
2. Automobile Liability: Insurance Services Office Form Number CA 0001 covering any auto
(Code 1), or if Contractor has no owned autos, hired (Code 8) and non-owned (Code 9) autos, with
limit no less than $1,000,000 per accident for bodily injury and property damage.
3. Workers' Compensation insurance as required by the State of California, with Statutory
Limits, and Employer's Liability Insurance with limit of no less than $1,000,000 per accident for bodily
injury or disease.
4. Environmental Impairment/Pollution Liability applicable to the work being performed, with a
limit no less than $2,000,000 per claim or occurrence and $2,000,000 aggregate per policy period of
one year.
If the contractor maintains broader coverage and/or higher limits than the minimums shown above,
the City of Stockton requires and shall be entitled to the broader coverage and/or the higher limits
maintained by the contractor. Any available insurance proceeds in excess of the specified minimum
limits of insurance and coverage shall be available to the City of Stockton.
Self-Insured Retentions
Self-insured retentions must be declared to and approved by the City of Stockton. The City of
Stockton may require the Contractor to purchase coverage with a lower retention or provide proof of
ability to pay losses and related investigations, claim administration, and defense expenses within the
retention. The policy language shall provide, or be endorsed to provide, that the self-insured retention
may be satisfied by either the named insured or City of Stockton. The CGL and any policies, including
Excess liability policies, may not be subject to a self-insured retention (SIR) or deductible that
exceeds $25,000 unless approved in writing by City of Stockton. Any and all deductibles and SIRs
shall be the sole responsibility of Contractor or subcontractor who procured such insurance and shall
not apply to the Indemnified Additional Insured Parties. City of Stockton may deduct from any
amounts otherwise due Contractor to fund the SIR/deductible. Policies shall NOT contain any self-
insured retention (SIR) provision that limits the satisfaction of the SIR to the Named Insured. The
policy must also provide that Defense costs, including the Allocated Loss Adjustment Expenses, will
satisfy the SIR or deductible. City of Stockton reserves the right to obtain a copy of any policies and
endorsements for verification.
Other Insurance Provisions
A. The General Liability, Automobile Liability, Contractors Pollution Liability, and/or Asbestos
Pollution policies are to contain, or be endorsed to contain, the following provisions:
1. The City of Stockton, its officers, officials, employees, and volunteers are to be covered
as additional insureds with respect to liability arising out of work or operations performed by or on
behalf of the Contractor including materials, parts or equipment furnished in connection with such
work or operations. General liability coverage can be provided in the form of an endorsement to the
Contractor's insurance (at least as broad as ISO Form CG 20 10 11 85 or both CG 20 10, CG 20 26,
CG 20 33, or CG 20 38; and CG 20 37 forms if later revisions used). Additional insured Name of
Organization shall read "City of Stockton, its officers, officials, employees, and volunteers." Policy
shall cover City of Stockton, its officers, officials, employees, and volunteers for all locations work is
done under this contract.
2. For any claims related to this project, the Contractor's insurance coverage shall be primary
and non-contributory insurance coverage at least as broad as ISO CG 20 01 04 13 as respects the
City of Stockton, its officers, officials, employees, agents, and volunteers. Any insurance or self-
insurance maintained by the City of Stockton, its officers, officials, employees, agents, or volunteers
shall be excess of the Contractor's insurance and shall not contribute with it. This requirement shall
also apply to any Excess or Umbrella liability policies. The City of Stockton does not accept
endorsements limiting the Contractor's insurance coverage to the sole negligence of the Named
Insured.
3. Each insurance policy required above shall provide that coverage shall not be canceled,
except with notice to the City of Stockton.
B. The Automobile Liability policy shall be endorsed to include Transportation Pollution Liability
insurance, covering materials to be transported by Contractor pursuant to the contract. This coverage
may also be provided on the Contractors Pollution Liability policy.
C. If Contractors Pollution Liability and/or Asbestos Pollution Liability and/or Errors &
Omissions coverages are written on a claims-made form (Does Not Apply to Commercial
General Liability):
1. The retroactive date must be shown and must be before the date of the contract or the
beginning of contract work.
2. Insurance must be maintained and evidence of insurance must be provided for at least five (5)
years after completion of the contract of work.
3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy
form with a retroactive date prior to the contract effective date, the Contractor must purchase an
extended period coverage for a minimum of five (5) years after completion of contract work.
4. A copy of the claims reporting requirements must be submitted to the City of Stockton for
review.
5. If the services involve lead-based paint or asbestos identification / remediation, the Contractors
Pollution Liability shall not contain lead-based paint or asbestos exclusions. If the services involve
mold identification / remediation, the Contractors Pollution Liability shall not contain a mold exclusion
and the definition of "Pollution" shall include microbial matter including mold.
Umbrella or Excess Policy
The Contractor may use Umbrella or Excess Policies to provide the liability limits as required in this
agreement. This form of insurance will be acceptable provided that all of the Primary and Umbrella or
Excess Policies shall provide all of the insurance coverages herein required, including, but not limited
to, primary and non-contributory, additional insured, Self-Insured Retentions (SIRs), indemnity, and
defense requirements. The Umbrella or Excess policies shall be provided on a true "following form"
or broader coverage basis, with coverage at least as broad as provided on the underlying
Commercial General Liability insurance. No insurance policies maintained by the Additional Insureds,
whether primary or excess, and which also apply to a loss covered hereunder, shall be called upon to
contribute to a loss until the Contractor's primary and excess liability policies are exhausted.
Acceptability of Insurers
Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M.
Best rating of no less than A:VII if admitted in the State of California.
Verification of Coverage
Contractor shall furnish the City of Stockton with original certificates and amendatory endorsements
or copies of the applicable policy language effecting coverage required by this clause and a copy of
the Declarations and Endorsements Pages of the CGL and any Excess policies listing all
policy endorsements. All certificates and endorsements and copies of the Declarations &
Endorsements pages are to be received and approved by the City of Stockton before work
commences. However, failure to obtain the required documents prior to the work beginning shall not
waive the Contractor's obligation to provide them. The City of Stockton reserves the right to require
complete, certified copies of all required insurance policies, including endorsements required by these
specifications, at any time. City of Stockton reserves the right to modify these requirements, including
limits, based on the nature of the risk, prior experience, insurer, coverage, or other special
circumstances.
Waiver of Subrogation
Contractor hereby grants to City of Stockton a waiver of any right to subrogation which any insurer of
said Contractor may acquire against the City of Stockton by virtue of the payment of any loss under
such insurance. Contractor agrees to obtain any endorsement that may be necessary to affect this
waiver of subrogation and provide a copy to the City of Stockton, but this provision applies regardless
of whether or not an endorsement has been issued.
The Workers' Compensation policy shall be endorsed with a waiver of subrogation in favor of
the City of Stockton for all work performed by the Contractor, its employees, agents, and
subcontractors. This provision applies regardless of whether or not an endorsement has been issued.
Subcontractors
Contractor shall require and verify that all subcontractors maintain insurance meeting all the
requirements stated herein, and Contractor shall ensure that City of Stockton is an additional insured
on insurance required from subcontractors. For CGL coverage subcontractors shall provide coverage
with a format least as broad as CG 20 38 04 13.
Duration of Coverage
CGL & Excess liability policies for any construction related work, including, but not limited to,
maintenance, service, or repair work, shall continue coverage for a minimum of 5 years for
Completed Operations liability coverage. Such Insurance must be maintained and evidence of
insurance must be provided for at least five (5) years after completion of the contract of work.
Special Risks or Circumstances
City of Stockton reserves the right to modify these requirements, including limits, based on the nature
of the risk, prior experience, insurer, coverage, or other special circumstances.
Certificate Holder Address
The address for mailing certificates, endorsements and notices shall be:
City of Stockton
Its Officers, Officials, Employees, and Volunteers
501 W Weber Avenue
Building 1, 4th Floor
Stockton, CA 95203

With GovernmentContracts, you can:
...=25036070&referralCode=OPS|RAMP Prime NAICS Prime NAICS Industry 811191: Automotive Oil Change...
City of Los Angeles
Bid Due: 11/12/2026
...Project ID: Title: Request for Quotes (RFQ): Road Maintenance Cold-Mix Asphalt and SS1 ...
San Benito County
Bid Due: 11/13/2026
...811191: Automotive Oil Change and Lubrication Shops Other Services (except Public Administration)...
City of Los Angeles
Bid Due: 11/17/2026
...to the City for motor oil, power steering fluid, engine coolant, transmission fluid, ...
City of Pasadena
Bid Due: 11/02/2026