PROJECT MANUAL
PROJECT NAME:
Newton Correctional Facility (NCF), Iowa Prison Industries
(IPI), Homes For Iowa (HFI) Phase II - Perimeter Fence
PROJECT ADDRESS:
Newton Correctional Facility (NCF)
Iowa Prison Industries (IPI)
Homes For Iowa (HFI)
307 S. 60th Ave. W
Newton, IA, 50208
PROJECT DATE: June 01, 2026
--------------------------------------------------------------------------------------------------------------------
OWNER:
Iowa Department of Administrative Services
109 Southeast 13th Street
Des Moines, Iowa 50319
OWNER PROJECT NUMBER: 9239.04
OWNER REQUEST FOR BID NUMBER: RFB 923904-01
--------------------------------------------------------------------------------------------------------------------
CONSTRUCTION MANAGER:
The Samuels Group
2929 Westown Parkway
Suite 200
West Des Moines, IA
50266
CONSTRUCTION MANAGER PROJECT NUMBER: 7892
--------------------------------------------------------------------------------------------------------------------
Farnsworth Group
14225 University Ave.
Ste 110
Waukee, IA
50263
ARCHITECT PROJECT NUMBER: 02401959.001
--------------------------------------------------------------------------------------------------------------------
DOC NCF IPI Homes For Iowa Facility Project - Phase II - Fencing
Newton, Iowa
RFB923904-01
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT 9239.00 BLANK PAGE 00 0000 - 0
06-01-2026
DOC NCF IPI - Phase II Perimeter Fence
Newton, Iowa
DAS Project 9239.04
RFB923904-01
DOCUMENT 00 01 05
CERTIFICATIONS
RFB #923904-01
END OF DOCUMENT 00 01 05
PROJECT 9239.04 CERTIFICATIONS 00 01 05 - 1
06-01-2026
DOC NCF IPI Homes For Iowa Facility Project - Phase II - Fencing
Newton, Iowa
RFB923904-01
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT 9239.00 BLANK PAGE 00 0000 - 0
06-01-2026
DOC NCF IPI Homes For Iowa Facility Project - Phase II - Fencing
Newton, Iowa
RFB923904-01
SECTION 00 0110
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS
1.01 DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
A. 00 0101 Project Title Page
B. 00 0105 Certifications
C. 00 0110 Table of Contents
D. 00 0115 List of Drawing Sheets
E. 00 0116 Bid Submittal Checklist
F. 00 1113 Notice to Bidders
G. 00 2113 Instructions to Bidders
H. 00 2113.01 IMPACS Electronic Procurement System Instructions
I. 00 2113.02 Sample Contractor Certificate of Insurance
J. 00 3113 Preliminary Schedule
K. 00 3132 Geotechnical Data
L. 00 3143 Permit Application
M. 00 4116 Bid Form
N. 00 4116.01 Non-Discrimination Clause Information
O. 00 4116.02 Targeted Small Business Information
P. 00 4313 Bid Security Forms
Q. 00 5200 Agreement Form
R. 00 6000 Payment Bond and Performance Bond Forms
SPECIFICATIONS
1.02 DIVISION 01 - GENERAL REQUIREMENTS
A. 01 1200 Contract Summary
B. 01 2200 Unit Prices
C. 01 2500 Substitution Procedures/Forms
D. 01 2600 Contract Modification Procedures
E. 01 2900 Payment Procedures
F. 01 3100 Project Management and Coordination
G. 01 3100.01 Web Based Construction Management
H. 01 3200 Construction Progress Documentation
I. 01 3300 Submittal Procedures
J. 01 4000 Quality Requirements
K. 01 4500 Special Inspections and Tests
L. 01 5000 Temporary Facilities and Controls
M. 01 6000 Product Requirements
N. 01 7300 Execution
O. 01 7700 Closeout Procedures
1.03 DIVISION 3 - CONCRETE
A. 03 3000 Cast-in-Place Concrete
PROJECT 9239.04 TABLE OF CONTENTS 00 0110 - 1
06-01-2026
DOC NCF IPI Homes For Iowa Facility Project - Phase II - Fencing
Newton, Iowa
RFB923904-01
1.04 DIVISION 31 - EARTHWORK
A. 31 1000 Site Clearing
B. 31 2000 Earthwork
C. 31 22 00 Grading
D. 31 23 16 Excavation
E. 31 23 23 Fill
F. 31 23 33 Trenching and Backfilling
G. 31 35 00 Erosions and Sediment Control
1.05 DIVISION 32 - EXTERIOR IMPROVEMENTS
A. 32 1123 Aggregate Base Courses
B. 32 1313 Concrete Paving
C. 32 1373 Pavement Joint Sealants
D. 32 3113 Chain Link Fencing
E. 32 3114 Cantilevered Gates
F. 32 9119 Landscape Grading
G. 32 9219 Seeding
1.06 APPENDIX
A. Geotechnical Data - Geotechnical Exploration PN 251210 (24 Pages)
END OF SECTION
PROJECT 9239.04 TABLE OF CONTENTS 00 0110 - 1
06-01-2026
DOC NCF IPI Homes For Iowa Facility Project - Phase II - Fencing
Newton, Iowa
RFB923904-01
SECTION 00 0115
LIST OF DRAWING SHEETS
DRAWINGS
1.01 SHEET TITLE
GENERAL
G0.0 PROJECT COVER SHEET
CIVIL
C0.1 CIVIL INFORMATION SHEET
C1.1 EXISTING CONDITIONS & DEMO
C2.1 LAYOUT PLAN
C2.2 FENCE LAYOUT SHEET
C3.1 GRADING PLAN
C6.1 DETAILS SHEET
C7.1 EROSION CONTROL & SEEDING PLAN
ARCHITECTURAL SITE
AC1.0 OVERALL ARCHITECTURAL SITE PLAN
AC1.1 ENLARGED ARCHITECTURAL SITE PLAN & DETAILS
AC2.1 TYPICAL PERIMETER FENCE SECTION & SWING GATE
ELEVATIONS
AC2.2 AUTOMATIC CANTILEVER GATE DETAILS
AC2.3 MISCELLANEOUS CANTILEVER GATE & FENCE ASSEMBLY
DETAILS
END OF SECTION
PROJECT 9239.04 LIST OF DRAWING SHEETS 00 0115 - 1
06-01-2026
DOC NCF IPI Homes For Iowa Facility Project - Phase II - Fencing
Newton, Iowa
RFB923904-01
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT 9239.00 BLANK PAGE 00 0000 - 0
06-01-2026
DOC NCF IPI Homes For Iowa Facility Project - Phase II - Fencing
Newton, Iowa
RFB923904-01
SECTION 00 0116
BID SUBMITTAL CHECKLIST
PART 1 - GENERAL
1.01 BID SUBMITTAL CHECKLIST
A. The Bidder is responsible to see that the bid is submitted online at IMPACS Electronic
Procurement System on or before the due date and time specified. Late bids shall not be
accepted.
B. Bids shall be typewritten or in ink. All information requested shall accompany the bid. All
blocks shall be completed. Errors shall be lined out and initialed.
C. The right is reserved to reject any or all bids. The State may waive minor deficiencies or
informalities in the best interest of the State of Iowa.
D. A properly prepared and submitted bid document is the bidder's responsibility.
E. Bids cannot be changed after the bid opening.
F. In all cases, no verbal communications by any party will override written communications from
the issuing office.
G. The Bid Form shall be completed in full and signed and submitted by an officer of the bidder
with authority to bind in a contract.
H. If Bid Bond is called for, it shall accompany the Bid submission.
I. If Non-discrimination Clause information is called for, it shall accompany the Bid submission
J. If Targeted Small Business Pre-bid Contact information is called for, it shall accompany the Bid
submission.
K. If Certificate of Site Visit form is called for, it shall accompany the Bid submission.
PART 2 - PRODUCTS - NOT USED
PART 3 - EXECUTION - NOT USED
END OF SECTION
PROJECT 9239.04 BID SUBMITTAL CHECKLIST 00 0116 - 1
06-01-2026
DOC NCF IPI Homes For Iowa Facility Project - Phase II - Fencing
Newton, Iowa
RFB923904-01
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT 9239.00 BLANK PAGE 00 0000 - 0