| Location: | California |
|---|---|
| Posted: | Mar 19, 2026 |
| Due: | Mar 24, 2026 |
| Agency: | Contra Costa County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Prebid Date | 3/2/26 10:00am |
| Bid Date | 3/24/26 2:00pm |
Contra Costa County
General work description: The work to be done generally consists of replacing a timber bridge with a reinforced concrete bridge with concrete pile foundations and two soldier pile retaining walls. Work includes constructing temporary stream diversion system, detour road, rock slope protection, drainage systems, guard railing, grading and paving. Construction will occur over one season.
Engineer's cost estimate: $2,475,000
Number of Working Days: 110

With GovernmentContracts, you can:
...Contact Email fat3559@lausd.net Category Construction Type RFQ-Prequal Description Paving Replacement...-Proposal Meeting for 2710048 ...
City of Los Angeles
Bid Due: 10/15/2026
...frames and covers, construction of curb and gutter, construction of concrete sidewalk, asphalt ...
City of Yorba Linda
Bid Due: 9/24/2026
...Department: Public Works Bid Type: Construction Bid Amount: $8,750,000.00 Commodity: CONSTRUCTION SERVICES..., but ...
County of Los Angeles
Bid Due: 10/15/2026
...paving, AC berm, construction of a pipe and board structure and a metal ...
City of Los Angeles
Bid Due: 9/23/2026