| Location: | California |
|---|---|
| Posted: | Mar 19, 2026 |
| Due: | Mar 24, 2026 |
| Agency: | Contra Costa County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Prebid Date | 3/2/26 10:00am |
| Bid Date | 3/24/26 2:00pm |
Contra Costa County
General work description: The work to be done generally consists of replacing a timber bridge with a reinforced concrete bridge with concrete pile foundations and two soldier pile retaining walls. Work includes constructing temporary stream diversion system, detour road, rock slope protection, drainage systems, guard railing, grading and paving. Construction will occur over one season.
Engineer's cost estimate: $2,475,000
Number of Working Days: 110

With GovernmentContracts, you can:
...generally consists of replacing existing guardrails including posts, railing, and end treatments...
Contra Costa County
Bid Due: 6/09/2026
..., grating, and miscellaneous steel, including railings, access ladders, and posts for the ...
City of Los Angeles
Bid Due: 6/19/2026
...and timber railings on both sides of the structure. A narrow timber walkway ...
Santa Cruz County
Bid Due: 6/17/2026