| Location: | Hawaii |
|---|---|
| Posted: | Mar 5, 2026 |
| Due: | Mar 11, 2026 |
| Agency: | General Contractors Association |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project Description: The Contractor shall provide all labor, tools, equipment, and materials necessary to perform all work related to replacing one (1) damaged 120-gallon electric hot water heater, replacing one (1) solar heating system control panel, and replacing one (1) solar heating system circulation pump in the Building 1788 Mechanical Room.
| Download |
|
Plans
Specifications
|
Addendums/Amendments
|

With GovernmentContracts, you can:
...metal framing, insulated metal wall panels, and structural steel support systems. Roofing..., and ...
DEPT OF DEFENSE
Bid Due: 10/28/2026
...Framing and Enclosure: Utilizing cold-formed metal framing, insulated metal wall panels..., and structural ...
DEPT OF DEFENSE
Bid Due: 10/30/2026
.... Structural Framing & Enclosure: Utilizing cold-formed metal framing, insulated metal wall panels..., ...
DEPT OF DEFENSE
Bid Due: 10/19/2026