| Location: | Hawaii |
|---|---|
| Posted: | Nov 25, 2025 |
| Due: | Dec 11, 2025 |
| Agency: | General Contractors Association |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project Description: Preparation, Painting, and Flooring Installation.
a. Remove and dispose of all wall base and flooring.
b. Clean and prepare the subfloor to include leveling where necessary.
c. Clean walls and doors; repair all surface imperfections on the walls and doors including cracks, holes, and other damage.
d. Prime and paint walls, doors, and door trim with low-VOC, commercial-grade paint designed for high-traffic, heavy-duty areas and commercial environments.
e. Install new wall base, carpet tile flooring, and/or waterproof plank flooring.
f. Adjust doors as required for clearance over new flooring.
| Download |
|
Plans
Specifications
|
Addendums/Amendments
|

With GovernmentContracts, you can: