| Location: | Hawaii |
|---|---|
| Posted: | Mar 5, 2026 |
| Due: | Apr 7, 2026 |
| Agency: | General Contractors Association |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project Description: This project involves a one-for-one replacement of two (2) existing air handling units in Wentworth Hall and three (3) existing air handling units in Marine Science Building, and removal and reinstallation of existing water heater and hot water storage tank in Marine Science Building. Additionally, ductwork and chilled water piping insulation throughout Wentworth Hall will be replaced. This work shall generally include selective demolition, structural steels, siding, firestopping, sealants, gypsum wallboard, acoustic ceiling tile, painting, louver, fire alarm system hardwired, general mechanical requirements, mechanical sound, vibration, and seismic control, mechanical insulation, chilled water piping, plumbing, air handling equipment, ductwork and accessories, direct digital control system, hvac testing/adjusting/balancing, electrical general requirements, wiring systems and interior lighting.
| Download |
|
Plans
Specifications
|
Addendums/Amendments
|

With GovernmentContracts, you can:
...and Industrial Control Manufacturing Place of Performance: JBPHH , HI 96860 USA Description ...
DEPT OF DEFENSE
Bid Due: 7/30/2026
...control and data acquisition (SCADA) systems. Communications Gateway - Support protocol conversion... between ...
DEPT OF DEFENSE
Bid Due: 7/30/2026
...operation for critical control applications. Communications and System Integration - Support integration..., and ...
DEPT OF DEFENSE
Bid Due: 7/30/2026
...maintaining system coordination. Breaker Control and Protection - Provide breaker failure protection... and ...
DEPT OF DEFENSE
Bid Due: 7/30/2026