Buskirk-Chumley Theater Solar & BESS Install Project

Location: Indiana
Posted: Oct 12, 2026
Due: Oct 29, 2026
Agency: City of Bloomington
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.


Project ID:

Title: Buskirk-Chumley Theater Solar & BESS Install Project

Addenda: 0

Release Date: 10/12/2026

Due Date: 10/29/2026

Follow
Buskirk-Chumley Theater Solar & BESS Install Project
General Solicitation
Parks and Recreation
Release Date: Monday, October 12, 2026
· Due Date: Thursday, October 29, 2026 11:00am
Posted Monday, October 12, 2026 7:00am
All dates & times in Eastern Time - New York
Draft Response Events RSVP No Bid16 days, 13 hours, 22 minutes


Post Information

Posted At:Mon, Oct 12, 2026 7:00 AM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

This project, titled ‘Buskirk-Chumley Theater Solar & BESS Install,’ shall include, but is not limited to, all labor, materials, equipment, permits, coordination, programming, testing, and incidental work necessary to furnish and install an operational electrical, lighting, building controls, and resiliency system in accordance with the contract drawings and specifications at the historic Buskirk-Chumley Theater, located in Bloomington, Indiana. The intent of this work is to provide a code-compliant, integrated electrical and Photovoltaic / Battery Energy Storage System (PV/BESS) resiliency system that supports safe building operation under normal conditions and utility outages while maintaining required life-safety, occupancy, and building protection functions.

All work must follow the approved design plans, meet City of Bloomington's requirements, and be completed within the project’s established timeline and budget.



Background

Work shall include coordination with applicable trades and utilities; connections to equipment furnished by others; electrical and lighting equipment; PV and BESS integration; building automation system (BAS) and mechanical controls; wiring, raceways, grounding and bonding, supports, labeling, and associated accessories, as shown in the Contract Documents. The Contractor shall provide required submittals, permits, inspections, testing, commissioning, as-built documentation, operating instructions, training, and warranties. In coordination with the Owner and design team, the Contractor shall develop and submit test procedures and demonstrate the approved normal operation, utility outage, resiliency, and restoration sequences. The Contractor shall document test results and correct deficiencies before Owner acceptance.

Perform the Work in accordance with the approved Contract Documents, applicable codes, City of Bloomington requirements, the project schedule, and the design specifications provided in the Exhibit E attachment (Solar&BESS_BCT Design Plans). This project is subject to applicable Build America, Buy America (BABA) requirements and the terms of the City’s grant agreement. Before procuring covered items, the Contractor shall submit manufacturer or supplier documentation demonstrating BABA compliance for iron and steel products, manufactured products, and construction materials incorporated into the project, including applicable PV, BESS, electrical, and mechanical components. The Contractor shall identify any item for which compliance cannot be documented promptly and shall not procure or install a proposed noncompliant substitute unless the City provides written authorization following any required Indiana Office of Energy Development (IOED) or federal review. Maintain compliance records and provide them to the City upon request.

Acceptable manufacturers and models shall be limited to equipment for which the bidder provides current manufacturer certification demonstrating compliance with the BABA for the exact equipment and materials being furnished. Such certification shall be on manufacturer letterhead and shall include, at a minimum, the project name, date of certification, manufacturer address, exact model numbers proposed, item or part naming convention or SKU as applicable, material classification under 2 CFR Part 184, an affirmative statement of BABA compliance, and signature of an authorized manufacturer representative. Contractors shall include in their bid package detailed information about the equipment and workmanship warranties provided for the solar and battery installations.



Timeline

Release Project Date:
October 12, 2026
Pre-Bid/Proposal Meeting (Mandatory):
October 20, 2026, 10:00am
City Hall, 401 N. Morton St, Bloomington, Indiana, 47404, inside the Allison Room
Question Submission Deadline:
October 23, 2026, 5:00pm
Question Response Deadline:
October 27, 2026, 12:00pm
Submission Deadline:
October 29, 2026, 11:00am
Contractor Selection Date:
November 12, 2026
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Date Type Title Views Size Info 10/29/2026 RFQ Tornado and Water Damage Restoration... ...

Town of Munster

Bid Due: 11/11/2026

...Number: 10022026_WRFFR Title: SMC 2026 Wetland Restoration Fund Fox River Watershed Description... in ...

Lake County

Bid Due: 11/02/2026

...Date Type Title Views Size Info 10/16/2026 RFQ | Building Demolition and Site ...

Town of Munster

Bid Due: 11/18/2026

...the systematic inspections, service, restoration, maintenance - related part replacements, call - back ...

State Government of Indiana

Bid Due: 12/02/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.