| Location: | Georgia |
|---|---|
| Posted: | Jul 16, 2025 |
| Due: | Sep 10, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-67860-NONST-2025-000000010 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-67860-NONST-2025-000000010 | Construction of Parks Creek Reservoir and Dam Project | Jefferson, City Of |
Jul 16, 2025 @ 11:36 AM
|
Sep 10, 2025 @ 02:00 PM
|
Start Date: Jul 16, 2025 @ 11:36 AM ET
End Date:
Sep 10, 2025 @ 02:00 PM ET
BID ADVERTISEMENT
Construction of Parks Creek Reservoir and Dam Project
The City of Jefferson (the ¿City¿) is soliciting sealed bids for furnishing all materials, labor, tools, equipment, and appurtenances necessary for the construction of the Parks Creek Reservoir and Dam Project. Sealed bids will be received by the City at the City of Jefferson City Hall located at 147 Athens Street, Jefferson, GA 30549, until 2:00 p.m., local time, on Wednesday, September 10th, 2025, and then at said office publicly opened and the bid price read aloud. The work is generally described as follows:
The construction of an earthen embankment dam, spillway systems, raw water pumping facilities, and raw water pipelines. The proposed dam will be located on Parks Creek in unincorporated Jackson County, Georgia approximately 4-¾ miles northeast of Jefferson, Georgia. The proposed reservoir will be supplemented by pumping water from the North Oconee River. Approximately 8,300 linear feet of raw water main will be required from the intake and pump station located at the North Oconee River to the proposed reservoir. A raw water intake and pump station will also be located at the proposed reservoir to withdraw water. Approximately 1,800 linear feet of raw water main will be required from the reservoir intake within the reservoir to a future water treatment plant on the southwest side of the dam. The proposed dam will have a maximum height of approximately 97 feet above the existing stream channel and a crest length of approximately 1,170 feet. The construction of this embankment is expected to require on the order of 500,000 cubic yards of zoned earth fill. The earthen embankment dam will also include the construction of an internal drainage system consisting of a chimney drain, trench drain and blanket drain. The principal spillway will consist of a 91-foot-tall reinforced concrete riser, 4 feet by 7-½ feet in interior plan dimensions, with a 420-foot-long prestressed concrete cylinder
| Code | Description |
| 95939 | Dam and Levee Construction, Maintenance, Management and Repair |
Priscilla Murphy
pmurphy@cityofjeffersonga.com
7063675121

With GovernmentContracts, you can:
..., Construction 15538 Field Offices and Sheds, Construction Type 67053 Pipeline Equipment and ...
State Government of Georgia
Bid Due: 6/12/2026
...Construction, Industrial Pipeline Insulation, Including Maintenance, Repair and Installation 91340... Construction, Pipeline, Including ...
State Government of Georgia
Bid Due: 7/09/2026
...Pipeline Equipment and Tools, Construction and Laying of the Pipeline 91117 C.I.P., Construction... ...
State Government of Georgia
Bid Due: 6/11/2026
...Construction, Industrial Pipeline Insulation, Including Maintenance, Repair and Installation 91378... Agency Event Status: ...
State Government of Georgia
Bid Due: 6/18/2026