| Location: | Florida |
|---|---|
| Posted: | Jul 29, 2026 |
| Due: | Aug 14, 2026 |
| Agency: | Flagler County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-ITB-018 |
| Publication URL: | To access bid details, please log in. |
Project ID: 26-ITB-018
Title: Air Traffic Control Tower Rehabilitation
Addenda: 0
Release Date: 7/27/2026
Due Date: 8/14/2026
This project includes the Rehabilitation of the Air Traffic Control Tower (ATCT) and supporting infrastructure at the Flagler Executive Airport. This project may include, but is not limited to; building envelope repair and repainting, structural repairs and structural improvements to the ATCT structure and tower cab catwalk, Tower cab carpet/cabinet/countertop replacement, Tower cab ceiling repairs and repainting, replacement of roof hatches, replacement of air conditioning systems (7 PTAC's and 2 RTU's), painting of the interior of the Tower cab and vestibule, and access control upgrades to consolidate the vehicular access gate, Tower entry door, and Tower elevator under a single card system.
Depending upon the availability of funding, the project may also include upgrades to hand railings, the addition of up-lighting on the Tower exterior, replacement of the vehicular gate operator, repainting of bollards, and seal coating/re-striping the ATCT parking lot inside of the ATCT security fencing.
A Design Criteria Package (DCP) has been provided as the primary design document for the solicitation. The DCP contains the directives, specifications, and details necessary to provide pricing for this invitation to bid.
Flagler Executive Airport's Air Traffic Control Tower (ATCT) is one of the busiest in the Contract Tower Program and its continued viability is vital to the aviation system and users it serves daily. The existing ATCT at FIN, built in 2009, exhibits signs of age accelerated by the salt laden environment that deteriorates its equipment and fixtures. The Airport has invested in maintenance projects on the tower for the past 15 years. This scope of work addresses significant needs beyond maintenance, including roof, window, AC system, building envelope repairs, and equipment upgrades needed to bring the facility up to current standards.

With GovernmentContracts, you can:
...] Communication Systems, Including Infrastructure [936-84] Towers, Radio/Radar, etc., Maintenance and Repair... (Including ...
City of St. Cloud
Bid Due: 6/21/2029
...Follow FY27 GNV Rebuild Cooling Towers Active Contract Opportunity Notice ID 36C24827Q0023 Related... ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 9/25/2026
...Centrifugal pump maintenance or repair service 72154110 Fin fan cooling tower maintenance and ...
State Government of Florida
Bid Due: 9/30/2026
...structure with new water cooled chillers and cooling towers on the roof. This ...
Melbourne Orlando International Airport
Bid Due: 10/06/2026