| Location: | Indiana |
|---|---|
| Posted: | Jul 29, 2026 |
| Due: | Aug 10, 2026 |
| Agency: | City of Bloomington |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: 2026 Curb Ramp Replacement Project - Phase I
Addenda: 1
Release Date: 7/27/2026
Due Date: 8/10/2026
NOTICE IS HEREBY GIVEN THAT THE BOARD OF PUBLIC WORKS OF THE CITY OF BLOOMINGTON, INDIANA, WILL RECEIVE SEALED Quote s FOR 2026 Curb Ramp Replacement Project - Phase I , THROUGH THE CITY'S PROCUREMENT PORTAL AT https://procurement.opengov.com/portal/bloomingtonin
This project shall include, but is not limited to, the
construction of curb ramps, curbs and sidewalks on Allen Street, Adams St and Woodlawn Ave. All sidewalks and curb ramps shall be compliant with the Public Right of Way accessibility guidelines (PROWAG) and the Indiana Department of Transportation (INDOT) design manual, standard drawings, and standard specifications, where the PROWAG and INDOT requirements are in conflict or the INDOT requirements more stringent, the PROWAG requirements shall be used.

With GovernmentContracts, you can:
...-qualification required 1611.01 Concrete Construction of Roads & Curbing, 1611.02 Asphalt Construction... PUBLIC ...
State Government of Indiana
Bid Due: 11/17/2026
..., is available at southbendin.gov/bids. Work includes construction of a new elevator shaft ...
City of South Bend
Bid Due: 11/24/2026
...,Concrete Repair ,Construction,Electrical,Mechanical Systems,Painting,Parks, Recreation, Buildings &...; Recreation Soliciator Fort Wayne IN, Parks ...
City of Fort Wayne
Bid Due: 11/24/2026
...Soliciator Allen County Highway Department Posting Type Construction Project Location Details City: Fort... ...
Allen County
Bid Due: 11/24/2026