| Location: | Washington |
|---|---|
| Posted: | May 12, 2026 |
| Due: | Jun 1, 2026 |
| Agency: | City of Spokane |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Bid Date | 6/1/26 1:00pm |
Spokane, WA
This project consists of the construction of approximately 50 linear feet of storm sewer, 67 wheelchair ramps, 2400 linear feet of concrete curb, 1600 square yards of pavement repair, 19,000 square yards of asphalt grinding and 2-inch thick HMA pavement, 7500 linear feet of crack sealing, 21,000 square yards of chipseal, pruning 120 trees, sundry utility adjustments, and other related miscellaneous items.

With GovernmentContracts, you can:
..., various stripe painting, concrete and asphalt saw cutting and coring of non-ACM/non-hazardous ...
Port of Seattle
Bid Due: 9/29/2026
...with hot mix asphalt (HMA), textured and pigmented cement concrete pavement, various roundabout..., ...
State Government of Washington
Bid Due: 10/21/2026
...class 4 - asphalt concrete paving. Public Works Publication Date September 04, 2026 ...
State Government of Washington
Bid Due: 10/07/2026
...System, removal of asphalt pavement, concrete sidewalk, and concrete curb and gutter, construction... ...
City of West Richland
Bid Due: 10/13/2026