| Location: | New Mexico |
|---|---|
| Posted: | Jul 29, 2026 |
| Due: | Aug 6, 2026 |
| Agency: | City of Gallup |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Whole Block Reconstruction - Ciniza Drive, Gallup NM
Addenda: 1
Release Date: 7/14/2026
Due Date: 8/6/2026
This project is for the improvement of Ciniza Drive, a designated collector street. Work for this project includes the construction of a concrete box culvert, removal and replacement of sidewalks, drivepads, curb and gutter, and asphalt pavement. It also includes installation of waterline valves, and the relocation of fire hydrants. Other miscellaneous work includes ADA curb ramps, traffic signs, removal and replacement of existing fencing and landscaping. An additive alternate includes concrete pavement removal and replacement.
The street improvements are located in Gallup, New Mexico along Ciniza Drive. The project runs from the intersection of Ciniza Drive and Toltec Drive east 930-feet to an existing drainage channel.

With GovernmentContracts, you can:
...platform) Perfusion Control Software - PCS (C16112) Fluidic timing, valve control, and flow-path ...
ENERGY, DEPARTMENT OF
Bid Due: 10/01/2026
...and variable air volumes. All pumps, valves and actuators. Remote software engineers operate ...
DEPT OF DEFENSE
Bid Due: 9/23/2026
...air handler and terminal units, and office air handler and variable air volumes. ...
DEPT OF DEFENSE
Bid Due: 9/23/2026
...volumes. All pumps, valves and actuators. Remote software engineers operate and monitor automation...
DEPT OF DEFENSE
Bid Due: 9/23/2026