| Location: | South Carolina |
|---|---|
| Posted: | Aug 21, 2026 |
| Due: | Sep 18, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | P28-C006-CB |
| Publication URL: | To access bid details, please log in. |
SE-655
INVITATION FOR TASK ORDER CONTRACT
AGENCY: PRT - Parks Recreation & Tourism Department
CONTRACT NAME: TOC - Roofing Services for State Park Properties in the Lower Coastal Region
CONTRACT NUMBER: P28-C006-CB CONSTRUCTION COST RANGE: $ N/A
CONTRACT LOCATION: Beaufort, Berkeley, Charleston, Colleton, Dorchester, Hampton, and Jasper Counties
DESCRIPTION OF PROJECT/SERVICES:
Roofing services for roof repairs and new roofs on state park buildings in the Lower Coastal Region.
SUBMITTAL DUE DATE: 09/18/2026 TIME: 05:00 PM NO. OF COPIES: Printed: 1 Electronic: 1
PROJECT DELIVERY METHOD: Design-Bid-Build
PRIME CONTRACTOR LICENSE (SPECIAL STANDARD OF RESPONSIBILITY): (150 character limit)
Contractors should possess at a minimum an Roofing (RF), Group 2 license.
AGENCY PROJECT COORDINATOR: Alex Fulmer, PE
EMAIL: afulmer@scprt.com TELEPHONE: (803) 973-1671
DOCUMENTS MAY BE OBTAINED FROM: No documents provided
Contractors interested in submitting a proposal must contact the Agency Project Coordinator and obtain a Contractor's
Statement of Qualifications & Questionaire. The Contractor will review the Selection Criteria listed in the form and verify
it can meet or exceed the Criteria. The Contractor will complete the form, provide any additional documentation required
by the Criteria, and submit it to the Agency at the address noted below by the submittal due date and time noted above.
Contractor will be required to provide Performance and Labor and Material Payment Bonds for each Task Order, each in
the amount of 100% of the contract price.
Task Order Contracts and Task Orders will be awarded in accordance with Chapter 9 of Manual for Planning and
Execution of State Permanent Improvements fount at https://procurement.sc.gov/manual
PUBLIC NOTICES: All notices (Meetings, Intent to Award TOC) shall be posted at the following location:
scprt.com/about/procurement-opportunities/construction-bids/bid-tabulations-results-notices-of-intent-to-award
LICENSURE: To be considered for selection, persons or firms must be properly licensed in accordance with the
requirements of Title 40 of the SC Code of Laws, as amended at the time of resume submission.
To submit confidential information, see Appendix I, OSE Manual, https://procurement.sc.gov/manual.
In accordance with the South Carolina Green Purchasing Initiative, it is preferred submittals not exceed 20 double-sided
pages.
All written communication with parties submitting information will be via email.
Agency will accept submittals via email above (PDF file no larger than 10MB):
Yes No
Any actual bidder, offeror, contractor or subcontractor who is aggrieved in connection with this solicitation or the intended
award or award of a contract under this solicitation may protest to the State Engineer in accordance with SC Code 11-
35-4210 at: CPO, Office of State Engineer, 1333 Main Street, Suite 700, Columbia, SC 29201, email: protest-
ose@mmo.sc.gov.
CONTRACT INFORMATION:
1. The contract period of the awarded Task Order Contract (TOC): 3 years with two 1-year extensions
2. Maximum expenditures over the period of the awarded TOC: $4,000,000.00
3. Minimum single task order expenditure that will be allowed under the awarded TOC: $90,000.00
4. Maximum single task order expenditure that will be allowed under the awarded TOC: $350,000.00
5. Number of TOC's Agency must award under this solicitation: 4
SUBMITTAL DELIVERY ADDRESSES:
HAND-DELIVERY: MAIL SERVICE:
Attn: Alex Fulmer, PE Attn: Alex Fulmer, PE
Sesqui Retreat Center, 9564 Two Notch Road Sesqui Retreat Center, 9564 Two Notch Road
Columbia, SC 29205 Columbia, SC 29205
APPROVED BY: DATE: 08/20/2026
(OSE PROJECT MANAGER)

With GovernmentContracts, you can:
...pavement. Construction of sitework and associated improvements for the new gravel parking lot.... ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/02/2026
...a turn key performance based services to implement utility savings measures and infrastructure... ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/29/2026
...Bid Number: 27-01-B Bid Title: New Hope Lateral Sewer Pipe Improvements Category: Request... ...
Aiken County
Bid Due: 9/22/2026