| Location: | Florida |
|---|---|
| Posted: | Jul 29, 2026 |
| Due: | Aug 24, 2026 |
| Agency: | City of Lakeland |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Terminal Hold Room Expansion
Addenda: 0
Release Date: 7/24/2026
Due Date: 8/24/2026
The purpose of this project is to expand the existing passenger terminal by adding hold room and associated restroom facilities, in order to increase passenger waiting capacity. The hold rooms will accommodate seated and standing passenger areas, airline agent check‑in podiums, Children's Play Area, Pet Relief Area and designated boarding lane space. This hold room expansion will be connected to the existing terminal post screening area by a corridor and accessed by ramps on the airside for arriving and departing passengers.
Please be sure and submit your pricing proposal, and also the bid form attachment (H)
The bidder shall provide a fully turnkey hold room facility, including all required building code compliance and permits, architectural interior and exterior finishes designed to closely match the existing terminal building, and all mechanical, electrical, plumbing, fire protection, technology, security, signage, wayfinding, and furnishings necessary to deliver a complete operational facility that does not interfere with airport operations. The bidder shall coordinate closely with the selected design engineering firm to complete the project in accordance with all FAA-required documents and applicable federal, state, and local requirements.
The bidder will be granted access to the project deliverables, including Basis of Design documents, design development-level calculations, site plans, architectural floor plans, enlarged plans, elevations, sections, preliminary schedules, an Opinion of Probable Cost at the Basis of Design level, and draft technical specifications. These materials will define the proposed architectural and engineering systems and support full project implementation.
The purpose of the project is to expand the existing passenger terminal by adding two modular hold rooms and associated restroom facilities to increase passenger waiting capacity. The hold rooms will include seated and standing passenger areas, airline agent check-in podiums, and designated boarding lane space. The new hold room expansion will connect to the existing terminal post-screening area by a corridor and will be accessed by airside ramps for arriving and departing passengers.

With GovernmentContracts, you can:
...The primary objective of this RFI is to explore advanced security solutions that ...
State Government of Florida
Bid Due: 10/23/2026
...technologies into a unified, event-driven enterprise security platform. Timeline Release Date: September 11... ...
Collier County
Bid Due: 10/12/2026
...Request for Information Innovative Security Solutions Florida Department of Corrections (FDC... or scientific ...
State Government of Florida
Bid Due: 10/24/2026
..., medical, and security emergencies. Furthermore, DoW mandates that all Operational Technology (OT... ...
DEPT OF DEFENSE
Bid Due: 9/17/2026