| Location: | Texas |
|---|---|
| Posted: | Jul 30, 2026 |
| Due: | Jul 31, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W56ZLW26Q0021 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
This requirement is for a turnkey additive manufacturing solution to establish an organic capability for producing replacement parts at Fort Hood, TX. The acquisition includes two specific industrial-grade 3D printers, along with all necessary services for immediate and sustained operation:
- Stratasys Origin Two (Polymer Printer): An industrial-grade 3D printer utilizing programmable photopolymerization (P3/DLP) technology. It must have a minimum build volume of 192 mm x 108 mm x 370 mm and be capable of producing high-accuracy end-use parts with complex geometries
.- Stratasys F370CR (Composite-Ready Printer): An industrial-grade Fused Deposition Modeling (FDM) 3D printer specifically designed for producing composite parts. It must have a minimum build volume of 355 x 254 x 355 mm and be capable of printing with high-strength, carbon fiber-reinforced thermoplastics.
The requirement also includes turnkey installation, configuration, and calibration of all equipment; manufacturer led on-site training for operators; all necessary software licenses and initial consumables; and a comprehensive warranty and technical support package. Training shall be scheduled and conducted only after the printer has been fully installed, calibrated, and verified as operational. Training includes but not limited to system operation, job setup, maintenance, and troubleshooting.
All questions must be submitted in writing to the POCs listed below no later than 10:00 am (CST), 31 July 2026. komlan.e.dougah.mil@army.mil
austin.c.sanderson.mil@army.mil

With GovernmentContracts, you can:
Spirit Apparel and Promotional Items Solicitation ID: 26-07-2040RFP Due Date: 6/30/2027 Due Time:
State Government of Texas
Bid Due: 6/30/2027
Bid #. Bid Title Addendums Closing Date Closing Time Buyer 2324-027-2029-B Online Only
Eagle Mountain-Saginaw Independent School District (EMS ISD)
Bid Due: 6/30/2027
Due Date: October 27, 2026 2:00 PM Park Name: Silver Lake State Park,
Texas Parks and Wildlife Department
Bid Due: 10/27/2026
Grease Trap Services Solicitation ID: 005-27 Due Date: 9/24/2026 Due Time: 2:00 PM
State Government of Texas
Bid Due: 9/24/2026