| Location: | New York |
|---|---|
| Posted: | Apr 17, 2026 |
| Due: | May 15, 2026 |
| Agency: | State Government of New York |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 353380 |
| Publication URL: | To access bid details, please log in. |
CUNY LaGuardia Community College E Building – Natural Sciences Labs Renovations and Asbestos Abatement
THIS SOLICITATION IS FOR EXPRESSIONS OF INTEREST (EOI) ONLY
See the Eligibility Requirements further down in this document.
Phase 1: The scope of work of this project includes the interior renovation and alteration of the 3rd floor of Building E to accommodate the relocation of occupational therapy and physical therapy labs with the addition of a new tutor space. The renovation/alteration includes but is not limited to demolition of walls, ceilings and floors; construction of new walls, ceilings, new floor and wall finishes; upgrade of ventilation fan in chemical storage room; plumbing, electrical, lighting, HVAC ductwork, new work benches, new cabinets and new laboratory equipment including fume hoods and refrigeration.
Additional scope of work items includes but are not limited to collateral roof work above the renovated/altered rooms on the third floor; collateral ceiling work at second floor above renovated/altered rooms will also be required for new plumbing piping.
Phase 2: the scope of work of this project includes the interior renovation and alteration of the 3rd floor of Building E to accommodate general chemistry, biology and physics labs as well as faculty research labs. The renovation/alteration includes but is not limited to demolition of walls, ceilings and floors; construction of new walls, ceilings, new floor and wall finishes; upgrade of ventilation fan in chemical storage room; plumbing, electrical, lighting, HVAC ductwork, new work benches, new cabinets and new laboratory equipment including fume hoods and refrigeration.
Additional scope of work items includes but are not limited to collateral roof work above the renovated/altered rooms on the third floor; collateral ceiling work on the second floor below renovated/altered rooms will also be required for new plumbing piping.
The estimated Construction Cost range is between $10,500,00 and $11,000,000.
Project Labor Agreement
The successful low bidder as a condition of being awarded this Contract, must execute the PLA included in the Contract Documents following the Form of Bid. The Work undertaken in connection with this Project will be governed by, and subject to the conditions set forth in the PLA. All Subcontractors of every tier, will be required to execute a Letter of Assent, included in the enclosed PLA, agreeing to be bound by the PLA. The PLA has been approved by the Building and Construction Trades Department, AFL-CIO.
Bidders for the construction of this project will be selected only after the review and evaluation of the qualification packages received in response to this notice.
Please note that the project drawings and specifications attached to DASNY’s website associated with this solicitation do not reflect 100% construction / bid documents. The documents provided are for reference only. Finalized construction / bid documents shall be distributed to the qualified contractors invited to bid.
Please find links to the specifications and drawings below:
General Conditions for Construction dated February 4, 2026, will apply to the Contract Documents.
The anticipated goals for EEO and M/WBE participation in the Work of the Contract are as follows:
Percent of Total Work Force (EEO):
Minority & Women Workforce Goal (for all trades) 45%
Percent of Total Contract (M/WBE):
Minority Business Enterprise Goal 18%
Women's Business Enterprise Goal 12%
Service-Disabled Veteran Owned Businesses 6%
Please note the Owner will determine the goals for EEO and M/WBE participation when the finalized construction / bid documents are distributed to the qualified contractors invited to bid.
Firms shall provide one (1) copy in pdf format of the EOI package via e-mail to ccontracts@dasny.org .
Instructions for Submission of the EOI Packages:
Each firm responding to this solicitation shall submit an EOI package organized and assembled in a clear, logical and professional manner consistent with the requirements set forth herein. Failure to comply with these instructions may render the submission non-responsive and subject to rejection.
Each package shall be submitted with:
Tabs must be in the following sequence:
Tab 1 – Company Profile
Provide a company profile that includes the following information:
Tab 2 –Experience
Provide documentation showing a minimum of five (5) years of experience with projects similar in size, scope, and complexity to the one being proposed.
Provide details for the five (5) relevant projects that have been completed- or substantially completed- within the last ten (10) years.
For each project, include the following information:
If applicable, also include a list of all DASNY projects completed within the last 5 years.
Tab 3 – Project Schedules
Provide three (3) sample project schedules for the same projects listed in Tab 2. These schedules should reflect projects of similar size, scope, and complexity to the referenced project.
Tab 4 – Safety Program
Provide the firm’s written safety program or site safety plan. Include the résumé of the person responsible for overseeing project safety.
Tab 5 – Résumés
Provide names and résumés for the proposed project team. Each résumé should demonstrate experience with at least one project of similar size, scope, and complexity to the referenced project. Team members should include, at minimum: Project Manager, Site Superintendent, Project Engineer, and Quality Control Representative.
Tab 6 – Potential Subcontractors
Provide a list of potential subcontractors for this project. For each potential subcontractor, identify anticipated M/WBE subcontract participation, the subcontractor’s trade, and brief description of their scope of work.
Tab 7 – Anticipated Workload
Provide a list other projects you firm will be working on during this project’s construction period. Include a statement explaining how your firm will successfully complete this project within the required timeframe.
Tab 8 – Experience Modification Rating
Provide a letter from your insurance provider indicating the firm’s Experience Modification Rating (EMR) over the past three (3) years. If your EMR is above 1.00, include a written explanation.
Tab 9 – Bonding Capacity
Provide a signed letter from a Surety Company attesting to your firm’s single, aggregate and available bonding capacity. If your available bonding capacity does not to meet the bonding requirements of this contract, you must explain how your firm will meet the bonding requirements.
Tab 10 – NYS Vendor Responsibility Questionnaire
Provide your online or hardcopy NYS Vendor Responsibility Questionnaire For-Profit Construction (CCA-2) certified within the last five (5) months. Firms shall provide the Certification page for the online version or the full questionnaire, if submitting a hardcopy.
Eligibility/Qualifications Requirements/Preferences:
Tabs 1 through 7 will be scored by a DASNY committee. Firms deemed qualified from this solicitation will be included on a short list and invited to submit a bid in the near future. Firms not following the EOI package requirements as noted shall be considered non-responsive to the advertisement. The construction contract will be held by DASNY.
Contract Security, EEO/AA Insurance, NY State Vendor Responsibility Questionnaire (Executive Order 125). See Contract Documents for details.
In accordance with State Finance Law § 139-j and § 139-k, this solicitation includes and imposes certain restrictions on communications between Dormitory Authority personnel and an Offerer during the procurement process. Designated staff for this procurement are: The Project Manager and ccontracts@dasny.org . Contacts made to other Dormitory Authority personnel regarding this procurement may disqualify the Offerer and affect future procurements with governmental entities in the State of New York. Please refer to the Authority's website ( www.dasny.org ) for Authority policy and procedures regarding this law, or the OGS website ( www.ogs.state.ny.us/aboutogs/regulations/defaultAdvisoryCouncil ) for more information about this law. All proposers, domestic and foreign, must be in compliance with New York State business registration requirements. Contact the NYS Department of State regarding compliance. In addition, business entities proposing to provide professional engineering services must obtain a Certificate of Authorization to Provide Engineering Services in New York State from the State Education Department. Proposals must be submitted in the full legal name of the proposer, or the full legal name plus a registered assumed name of the proposer, if any.
Mary Anderson
Sr. Project Manager
Downstate Construction
LaGuardia Community College
29-10 Thomson Avenue
Building C, 9th Floor
Long Island City, New York 11101
United States
Phone: 718-752-3848
Email: MAnderso@DASNY.org
Submit To ContactJoshua Powers
Sr. Procurement Administrator
DASNY
Procurement
515 Broadway
Albany, NY 12207
United States
Phone: 5182573341
Email: ccontracts@dasny.org
| 515 BROADWAY ALBANY, NY 12207-2964 518.257.3000 28 LIBERTY STREET 55TH FLOOR NEW YORK, NY 10005-1400 212.273.5000 800.992.2788 6047 TRANSIT ROAD SUITE 103 EAST AMHERST, NY 14051 716.566.4400 3495 WINTON PLACE BUILDING C, SUITE 1 ROCHESTER, NY 14623 585.450.8400 |
| THESE DOCUMENTS CONTAIN POTENTIALLY SENSITIVE INFORMATION AND SHALL BE USED FOR THEIR INTENDED PURPOSE. ONCE THE INTENDED PURPOSE HAS CEASED, THE DOCUMENTS SHALL BE DESTROYED IN A SECURE MANNER. IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON, UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER TO ALTER THIS DOCUMENT IN ANYWAY. ALTERATIONS MUST HAVE THE SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS, DATE AND ARCHITECT'S/ENGINEER'S SIGNATURE. COPYRIGHT (C) 2022 |
PROJECT MANUAL
LAGUARDIA COMMUNITY COLLEGE
E BUILDING - NATURAL SCIENCES LABS
RENOVATIONS AND ASBESTOS ABATEMENT
31-10 THOMPSON AVENUE
LONG ISLAND CITY, NY 11101
515 BROADWAY
ALBANY, NY 12207-2964
518.257.3000
28 LIBERTY STREET
55TH FLOOR DASNY PROJECT NUMBER: 3533809999
NEW YORK, NY 10005-1400
CLIENT NUMBER: DASN1906
212.273.5000
800.992.2788
04/15/2026
DATE:
6047 TRANSIT ROAD
SUITE 103
NOT FOR CONSTRUCTION
EAST AMHERST, NY 14051
716.566.4400
3495 WINTON PLACE H2M Architects + Engineers
BUILDING C, SUITE 1
ROCHESTER, NY 14623 538 Broad Hollow Road, 4th Floor East
585.450.8400 Melville, New York 11747
631-756-8000 extension 1388
Seals & Signatures
THESE DOCUMENTS CONTAIN POTENTIALLY
SENSITIVE INFORMATION AND SHALL BE USED FOR
THEIR INTENDED PURPOSE. ONCE THE INTENDED
PURPOSE HAS CEASED, THE DOCUMENTS SHALL BE
DESTROYED IN A SECURE MANNER.
IT IS A VIOLATION OF STATE EDUCATION LAW FOR
ANY PERSON, UNLESS UNDER THE DIRECTION OF A
LICENSED ARCHITECT/ENGINEER TO ALTER THIS
DOCUMENT IN ANYWAY. ALTERATIONS MUST HAVE
THE SEAL AFFIXED ALONG WITH A DESCRIPTION OF
THE ALTERATIONS, DATE AND
ARCHITECT'S/ENGINEER'S SIGNATURE. COPYRIGHT
(C) 2022
Construction Front End Documents
ALBANY (HEADQUARTERS): 515 Broadway, Albany, NY 12207 | 518-257-3000 DASNY
BUFFALO: 6047 Transit Road, Suite 103, East Amherst, NY 14051 | 716-566-4400 WE FINANCE, DESIGN & BUILD
NEW YORK'S FUTURE.
NEW YORK CITY: 28 Liberty Street, Fl 55, New York, NY 10005 | 212-273-5000
www.dasny.org
ROCHESTER: 3495 Winton Place, Building C, Suite 1, Rochester, NY 14623 | 585-461-8400
Construction Front End Documents
Table of Contents
DIVISION 00
COVER PAGE - CONSTRUCTION BIDDING REQUIREMENTS
NOTICE TO BIDDERS
INFORMATION FOR BIDDERS
FORM OF BID
OMNIBUS PROCUREMENT CERTIFICATION
W-9 FORM
BID BOND
COVER PAGE - CONSTRUCTION CONTRACT FORMS
SCOPE VERIFICATION FORM
INSURANCE FORM (draft)
AGREEMENT (draft)
PAYMENT BOND (draft)
PERFORMANCE BOND (draft)
COVER PAGE - CONSTRUCTION GENERAL CONDITIONS
GENERAL CONDITIONS
PREVAILING WAGE RATES
APPENDICES (facility standards, soils investigation, hazard waste reports, etc...)
DIVISION 01
COVER PAGE - CONSTRUCTION GENERAL REQUIREMENTS
TABLE OF CONTENTS - GENERAL REQUIREMENTS (project specific)
STANDARD GENERAL REQUIREMENT SECTIONS (project specific sections)
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
011200 CONTRACT SUMMARY OF WORK
012100 ALLOWANCES
012300 ALTERNATES
012500 PRODUCT SUBSTITUTION PROCEDURES
012900 PAYMENT PROCEDURES
013100 PROJECT MANAGEMENT AND COORDINATION
013200 PROJECT SCHEDULING
013300 SUBMITTAL PROCEDURES
014000 QUALITY AND CODE REQUIREMENTS
014500 QUALITY CONTROL
015000 TEMPORARY FACILITIES AND CONTROLS
016000 PRODUCT REQUIREMENTS
016500 PRODUCT DELIVERY, STORAGE AND HANDLING
017329 CUTTING AND PATCHING
017419 CONSTRUCTION WASTE MANAGEMENT
017423 CLEANING
017700 CONTRACT CLOSEOUT REQUIREMENTS
017800 CLOSEOUT SUBMITTALS
017823 OPERATION AND MAINTAINANCE MANUAL
017839 AS BUILT DOCUMENTS
017913 GENERAL COMMISSIONING REQUIREMENTS
DIVISION 02 - EXISTING CONDITIONS
020100 MAINTENANCE OF EXISTING CONDITIONS
024119 SELECTIVE DEMOLITION
028300 REMOVAL AND DISPOSAL OF LEAD-CONTAINING PAINT
028500 MOLD REMEDIATION
028700 REMOVAL AND DISPOSAL OF UNIVERSAL WASTE
DIVISION 03 - CONCRETE
030130.71 CONCRETE REHABILITATION
035413 GYPSUM CEMENT UNDERLAYMENT
DIVISION 05 - METALS
054000 COLD-FORMED METAL FRAMING
055000 METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
061000 ROUGH CARPENTRY
064100 ARCHITECTURAL WOOD CASEWORK
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
071400 FLUID-APPLIED WATERPROOFING
072116 ACOUSTIC INSULATION
LGCC STEM Lab Renovations -
TABLE OF CONTENTS 04-07-2026
353380
076200 SHEET METAL FLASHING AND TRIM
077200 ROOF ACCESSORIES
078100 SPRAY-APPLIED FIRE PROTECTION
078400 FIRESTOPPING
078413 PENETRATION FIRESTOPPING
079200 JOINT SEALANTS
DIVISION 08 - OPENINGS
080671 DOOR HARDWARE SCHEDULE
081113 HOLLOW METAL DOORS AND FRAMES
081213 HOLLOW METAL FRAMES
084123 FIRE RATED GLASS AND FRAMING SYSTEMS
087100 DOOR HARDWARE
088000 GLAZING
DIVISION 09 - FINISHES
092216 NON-STRUCTURAL METAL FRAMING
092900 GYPSUM BOARD
093013 TILING -THIN-SET
095113 ACOUSTICAL PANEL CEILINGS
096513 RESILIENT BASE AND ACCESSORIES
096516.23 VINYL SHEET FLOORING
096519 RESILIENT TILE FLOORING
096716.11 DECORATIVE EPOXY FLUID-APPLIED SELF-LEVELING
FLOORING (HYBRI-FLEX)
097733 GLASS FIBER REINFORCED PLASTIC PANELS
099123 INTERIOR PAINTING
DIVISION 10 - SPECIALTIES
101101 VISUAL DISPLAY SURFACES
101423 SIGNAGE
102600 WALL AND CORNER PROTECTION
102800 TOILET, BATH, AND LAUNDRY ACCESSORIES
104413.13 FIRE PROTECTION CABINETS-FIRE RATED
104416 FIRE EXTINGUISHERS
105613 METAL STORAGE SHELVING
DIVISION 11 - EQUIPMENT
115213 PROJECTION SCREENS
115300 LABORATORY EQUIPMENT
115313 LABORATORY FUME HOODS
115353 BIOLOGICAL SAFETY CABINETS
DIVISION 12 - FURNISHINGS
122400 WINDOW SHADES
123553.13 METAL LABORATORY CASEWORK
LGCC STEM Lab Renovations -
TABLE OF CONTENTS 04-07-2026
353380
123553.19 WOOD LABORATORY CASEWORK
123600 COUNTERTOPS
DIVISION 21 - FIRE SUPPRESSION
210500 COMMON WORK RESULTS FOR FIRE SUPPRESSION
210553 IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND
EQUIPMENT
211300 FIRE-SUPPRESSION SPRINKLER SYSTEMS
DIVISION 22 - PLUMBING
220517 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING
220523 GENERAL-DUTY VALVES FOR PLUMBING PIPING
220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND
EQUIPMENT
220553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
220719 PLUMBING PIPING INSULATION
221005 PLUMBING PIPING
221500 GENERAL-SERVICE COMPRESSED-AIR SYSTEMS
223000 PLUMBING EQUIPMENT
224000 PLUMBING FIXTURES
224500 EMERGENCY PLUMBING FIXTURES
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
230010 GENERAL MECHANICAL REQUIREMENTS
230015 MECHANICAL DEMOLITION
230135 HVAC SYSTEM CLEANING
230529 PIPE HANGERS AND SUPPORTS
230548 VIBRATION ISOLATION AND SEISMIC/WIND RESTRAINTS FOR
HVAC&R EQUIPMENT, DUCTWORK, AND PIPING
230555 MECHANICAL SYSTEM IDENTIFICATION
230594.12 BALANCING OF AIR SYSTEMS
230700 PIPE INSULATION
230702 FIRESTOPPING FOR HVAC
230703 ROOF ACCESSORIES FOR HVAC SYSTEMS
230719 DUCTWORK INSULATION
230800 COMMISSIONING OF MECHANICAL SYSTEMS
230991 INSTRUMENTATION AND CONTROL INTEGRATION
230993 SEQUENCE OF OPERATIONS
232001 CONDENSATE DRAIN PIPING
232300 REFRIGERANT PIPING
233113 SHEET METAL WORK
233416 EXHAUST FANS
233417 VARIABLE FREQUENCY DRIVES
233616 VARIABLE AIR-VOLUME UNITS
LGCC STEM Lab Renovations -
TABLE OF CONTENTS 04-07-2026
353380
233713 DIFFUSERS, REGISTERS AND GRILLES
233714 FAN FILTER UNIT
237213 AIR COOLED CONDENSING UNITS
237313 AIR HANDLING UNITS
237433 DEDICATED OUTDOOR AIR UNITS
238144 ENERGY RECOVERY VENTILATOR
238416 PACKAGED DEHUMIDIFICATION UNITS
DIVISION 26 - ELECTRICAL
260000 ELECTRICAL
260010 ELECTRICAL DEMOLITION
260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND
CABLES
260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
260533 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS
262400 PANELBOARDS
262726 WIRING DEVICES
262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
265000 LIGHTING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
283100 FIRE DETECTION AND ALARM
ATTACHED SUPPLEMENTAL DOCUMENTS
APPENDIXA
APPENDIXB
CONTRACTSTATE
EPA
LEADWASTE
APPENDIXA MOLD
CONTRACTMOLD
APPENDIXB MOLD
MOLDPLAN
APPENDIXA-UW
WASTELOG
FIRESTOPPPING SCHEDULE
LGCC STEM Lab Renovations -
TABLE OF CONTENTS 04-07-2026
353380
Construction Bidding Requirements
ALBANY (HEADQUARTERS): 515 Broadway, Albany, NY 12207 | 518-257-3000 DASNY
BUFFALO: 6047 Transit Road, Suite 103, East Amherst, NY 14051 | 716-566-4400 WE FINANCE, DESIGN & BUILD
NEW YORK CITY: 28 Liberty Street, Fl 55, New York, NY 10005 | 212-273-5000 NEW YORK'S FUTURE.
ROCHESTER: 3495 Winton Place, Building C, Suite 1, Rochester, NY 14623 | 585-461-8400 www.dasny.org
INFORMATION FOR BIDDERS
PLACE HOLDER
PROJECT SPECIFIC INFORMATION FOR BIDDERS
TO BE PROVIDED BY DASNY CONTRACTS UNIT
UPON APPROVAL FOR BIDDING
BIDDING REQUIREMENTS for CONSTRUCTION
FORM OF BID
TO THE DORMITORY AUTHORITY OF THE STATE OF NEW YORK
(Owner)
For
(Title of Project)
Pursuant to and in compliance with the Owner's Notice to Bidders dated
and the Contract Documents relating hereto, the undersigned hereby offers to Provide all plant, labor,
materials, supplies, equipment, Allowances, if applicable and other facilities and things necessary or proper
for or incidental to the Work of:
(Contract Type or Trade)
as required by, and in strict accordance with applicable Contract Documents, including written changes
thereto, and addenda issued by the Owner and sent to the undersigned or delivered to the bidder or available
to the bidder prior to the opening of bids, whether received by the undersigned or not, for the total sum of:
(Written Dollar Amount)
($ )
(Figure Dollar Amount)
The above Written Dollar Amount is the undersigned's bid and no other number on any page submitted
with this page 1 of the FORM OF BID can be the undersigned's bid under any circumstance.
The bid may be withdrawn at any time prior to the scheduled time for the opening of bids or any authorized
postponement thereof.
If the Letter of Intent is sent or delivered to the undersigned within sixty (60) days after the date of opening
of the bids, or any time thereafter before the bid is withdrawn, the undersigned shall, within fourteen (14)
days after the date of such Letter of Intent, execute and deliver the Agreement in the form included in the
Contract Documents.
The undersigned hereby designates as the undersigned's office to which the Letter of Intent may be sent or
delivered:
Name:
Firm's Legal Name:
Street Address:
PO Box #:
City, State, Zip Code:
Phone Number:
Email Address:
FORM OF BID
December 4, 2024 Page 1

With GovernmentContracts, you can:
...26 Title: Construction/Various CR#: 2137479 Agency: Transportation, NYS Dept. of Issue date: 7/24.../2026 ...
The New York State Contract Reporter
Bid Due: 8/27/2026
...Title: General Construction Medium Projects Procurement Section Design and Construction (DDC...@ddc.nyc.gov Contact Information ...
The City of New York
Bid Due: 12/31/2040
...35 Title: Town of Oneonta Pavilion Construction Note: Sealed bids will be received ...
The New York State Contract Reporter
Bid Due: 8/07/2026
...Title: General Construction - Medium Projects Procurement Section Design and Construction (DDC...@ddc.nyc.gov Contact ...
The City of New York
Bid Due: 11/18/2099