| Location: | South Carolina |
|---|---|
| Posted: | Apr 20, 2026 |
| Due: | May 15, 2026 |
| Agency: | Beaufort - Jasper Water & Sewer Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2026-IFB-024 |
| Publication URL: | To access bid details, please log in. |
Project Description: Work includes replacement of approximately (15) fire hydrants as shown in the attached replacement spreadsheet and location asset maps. Installation shall include removal of the existing hydrant and installation of new contractor supplied hydrants, hydrant isolation valves (where required), piping appurtenances and site restoration work. Work to include all applicable road repaving, restriping, erosion control, traffic control, etc. All work will be completed in compliance with BJWSA Technical Specifications and Details.

With GovernmentContracts, you can:
...improvements, concrete work, curbing, gates, fencing, signage, pavement markings, erosion control, and related...
City of Isle of Palms
Bid Due: 9/25/2026
...installation, erosion and sediment control, and final site restoration are all included in ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/24/2026
...and controller with strain pole installation, thermoplastic pavement marking, sediment and erosion control... ...
County of Spartanburg
Bid Due: 10/01/2026
...), abandonment of the existing line with non-shrink grout, sewer by-pass/flow control during ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/21/2026