RFQ 683931: Construction of Sterling Boulevard W&O...

Location: Virginia
Posted: Sep 29, 2025
Due: Nov 3, 2025
Agency: State Government of Virginia
Type of Government: State & Local
Category:
  • 80 - Brushes, Paints, Sealers, and Adhesives
Solicitation No: IFB 104169
Publication URL: To access bid details, please log in.
RFQ 683931: Construction of Sterling Boulevard W&O...
Status: Open
IFB 104169

County of Loudoun -Loudoun County

Closing On: 11/3/25 4:00 PM

Time Left: 34 days

ATTENTION: Visit www.loudoun.gov/bids to download the full solicitation for full details on the submission process. Online responses in EVA will not be accepted or considered. The Intent of this Invitation for Bid (IFB) is for the County of Loudoun, Virginia (County) to obtain the services of a qualified General Contractor (Contractor) to construct a shared-use path overpass across Sterling Boulevard (Route 846) at the Washington & Old Dominion (W&OD) Trail (the Project). This infrastructure improvement will replace the existing at-grade trail crossing with a pedestrian bridge, enhancing safety and connectivity for trail users.The Project will provide shared use path connections to existing pedestrian facilities on both sides of South Sterling Boulevard and serve a wide variety of users, such as walkers, bicyclists, joggers, rollerbladers, horseback riders, and other trail enthusiasts. The Project site is located within the Sterling District of Loudoun County, Virginia.The scope of work for this Project includes all necessary surveying and construction layout, maintenance of traffic throughout construction, and earthwork activities such as the removal of unsuitable material and rock excavation. Contractors are responsible for implementing erosion and sediment control measures, complying with environmental regulations, and obtaining all required permits, including, but not limited to, Virginia Stormwater Management Program (VSMP)/Stormwater Pollution Prevention Plan (SWPPP), building trade, and environmental permits. The Project entails bridge construction, installation of an asphalt trail, storm drainage improvements, landscaping, and the enforcement of appropriate safety procedures. All work must be executed in full compliance with applicable standards to ensure successful completion of the pedestrian overpass and associated trail connections.

IFB Construction

Closing On: 11/3/25 4:00 PM

Time Left: 34 days

View Opportunity

Add to Favorites

View Opportunity

Add to Favorites
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...infrastructure necessary for full operational use, including pavement construction, earthwork and grading... necessary ...

Delta Airport Consultants, Inc.

Bid Due: 6/15/2026

...earthwork and most of the connecting apron for the project was completed on ...

Delta Airport Consultants, Inc.

Bid Due: 6/17/2026

...............................................................................................02055 Earthwork ..............................................................

Greene County

Bid Due: 6/10/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.