| Location: | Florida |
|---|---|
| Posted: | May 30, 2025 |
| Due: | Jun 24, 2025 |
| Agency: | JEA |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The scope of services includes, but is not limited to providing; the labor, supervision, materials, supplies, equipment, and subcontracts necessary to crush limestone from 3” (some pieces may be larger) to a minimum of 1/2” at the JEA Northside Generating Station power plant site.
Scope of work includes taking 3” sized limestone once JEA receives it via vessel and crushing it JEA’s required size of no larger than 1/2”. Limestone will be offloaded to JEA’s onsite storage barn by JEA personnel. Delivered material will need to be processed onsite and then returned to the storage barn. Room exists external to the barn for handling and processing. Processing equipment may be set up inside the barn as well as space allows.
Processing must be able to accommodate two generating unit operation. At two-unit operation the limestone usage rate approaches 1400 tons per day (TPD).
A more detailed description of the Work is provided in the Technical Specifications included as an Exhibit to this Solicitation.
USE THIS LINK TO ACCESS THE SOLICITATION ON ZYCUS:
https://zsn.zycus.com/guest/genericRegister/JEA074/iSource/964712/
Optional Pre-Response Meeting: May 11, 2025, at 11:00 AM
Response Due Date: June 24, 2025

With GovernmentContracts, you can:
...Description: LIMESTONE CREEK PUBLIC USE FACILITIES REPLACEMENT Department: Environmental Resources...
Palm Beach County
Bid Due: 1/23/2030
...Description: LIMESTONE CREEK PUBLIC USE FACILITIES REPLACEMENT Department: Facilities Dev &...
Palm Beach County
Bid Due: 6/02/2030
...Description: LIMESTONE CREEK PUBLIC USE FACILITIES REPLACEMENT Department: Environmental Resources...
Palm Beach County
Bid Due: 2/28/2030
...Description: ARTIFICIAL REEF MATERIAL AND LIMESTONE ROCK, PURCHASE, DELIV Department: Procurement...
Palm Beach County
Bid Due: 8/28/2030