INVITATION TO BID – Snow Removal Equipment Building
The Central West Virginia Regional Airport Authority (CWVRAA) is notifying the contracting community of an upcoming construction contract opportunity at West Virginia International Yeager Airport (CRW). CWVRAA plans to install a new Pre-Engineered Metal Building (PEMB – approximately 23,560 sq ft) for the storage of Snow Removal Equipment. The project will take place landside/ outside of the Airfield Security Area. This work will be funded by a Federal Aviation Administration (FAA) grant and will be subject to FAA grant requirements and reporting obligations.
DESCRIPTION OF WORK
SRE Building work includes: Removal of existing pavement and general site clearing. Erosion and sediment control device. Installation of a new Pre-Engineered Metal Building, including concrete footings. Installation of a paved roadway (asphalt) Installation of new utilities: Water, Sanitary, Electrical, Telecommunication and Storm drain. New fencing and gate. New Security Cameras and Card Readers. Installation of bollards, sidewalk and pavement marking
ANTICIPATED TRADES / CONTRACTORS: Demolition, Concrete, Electrical, Mechanical, Plumbing, PEMB
SCHEDULE
Notice to Proceed will be issued following receipt of the FAA grant. The current anticipated construction duration is 240 Consecutive Calendar Days. Description of Work is not final and is not a substitute for full plan set.
CONTACT: For more information, please contact: Rebecca McDonald rmcdonald@adci-corp.com 978-471-9168 or visit https://flycrw.com/business-at-crw/