| Location: | Vermont |
|---|---|
| Posted: | Sep 5, 2025 |
| Due: | Oct 1, 2025 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Request for Proposal Locations: Washington Keywords: Insulation Contractor Bid Description: Application of closed cell spray foam, and any Code required fire barrier, to the below grade crawl space vertical walls (approximately 600 sq.ft) to achieve R-21. The attic work (approximately 1,000 sq.ft.) includes the spraying of a 1.5 inch thick foam “air barrier” of insulation on the attic floor followed by 13 inches of loose fill cellulose. Other work in the attic will include building plywood walls/dams alongside the outer framing and access door to keep the cellulose from going beyond the attic. Bid documents and requirements: Full bid documents and bidding requirements are available at https://roxburyvt.org. In order to coordinate with Vermiculite abatement, the attic work must be performed the first week of November. Site inspection is required by all bidders.
|
||||||||||||||||||||

With GovernmentContracts, you can:
ST. ALBANS STP MVRT (2) Request Date: 6/10/2026 11:17:44 AM Open Date: Closing
State Government of Vermont
Bid Due: 7/10/2026
Airboat Repair and Maintenance Request Date: 6/5/2026 11:38:37 AM Open Date: Closing Date:
State Government of Vermont
Bid Due: 7/31/2026
MIL DEPT - EAFR Wildland Fire Apparatus Building Request Date: 5/26/2026 10:21:21 AM
State Government of Vermont
Bid Due: 7/15/2026
Northern State Correctional Facility (NSCF) Fire Pump Replacement Request Date: 5/27/2026 12:24:39 PM
State Government of Vermont
Bid Due: 7/17/2026