| Location: | New Jersey |
|---|---|
| Posted: | Apr 8, 2025 |
| Due: | May 8, 2025 |
| Agency: | Burlington County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CPU-24-0079B |
| Publication URL: | To access bid details, please log in. |
Bid Information
| Type | Invitation to Bid |
| Status | Issued |
| Number | CPU-24-0079B (Resource Recovery Complex Wastewater Treatment System) |
| Issue Date & Time | 4/8/2025 10:30:02 AM (ET) |
| Close Date & Time | 5/8/2025 10:30:00 AM (ET) |
| Question Cut Off Date | 4/21/2025 10:00:00 PM (ET) |
| Notes |
Bidders must read the important notices provided below:
The County of Burlington has issued a solicitation of bids titled "Resource Recovery Complex Wastewater Treatment System" (CPU-24-0079B). The bid specifications and drawings are available for download by prospective bidders under the "Attachments" tab within the solicitation located at
https://burlcobids.ionwave.net. Bid documents and forms must be downloaded and submitted in their original format. Any bid modified from the original format will not be accepted.
All bids shall be submitted electronically at https://burlcobids.ionwave.net. The County shall not accept any bid submissions via email, fax, courier, mail, or in-person delivery. Any physical bid delivered will be returned to the sender unopened. The County is not responsible for any bid not submitted on time. The County is not responsible for any internet or electronic issues that may include, but not be limited to, connection issues, technical difficulties, errors, power outages, etc.
Bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq and N.J.A.C. 17: 27-1 et seq.
All solicitations are subject to change. Bidders are advised to check the County's eProcurement system periodically for any future addenda, revisions, etc. prior to the opening date.
The Division of Purchasing's public office hours are Monday through Friday from 9:00 A.M. to 4:00 P.M. EST, County holidays excluded.
AN IN-PERSON PRE-BID CONFERENCE IS SCHEDULED FOR 04/15/2025 AT 10:00 A.M. (LOCAL TIME) AT THE ECOCOMPLEX LOCATED AT 1200 FLORENCE-COLUMBUS ROAD, BORDENTOWN, NJ 08505. A SITE VISIT TO THE PLANT LOCATION WILL FOLLOW THE PRE-BID MEETING. ATTENDANCE IS RECOMMENDED BUT
NOT
MANDATORY.
------------------------------------------------------------------------------------------------------------
THE BID OPENING CAN BE VIEWED BY JOINING THE WEBEX LINK BELOW TEN (10) MINUTES BEFORE THE SCHEDULED OPENING:
Link:
https://burlingtoncounty.webex.com/burlingtoncounty/j.php?MTID=mc6189146f707cb328072a3052ea47fce
Date/Time: May 8, 2025 at 10:30 A.M. Eastern Time (US & Canada)
Meeting number: 2334 897 7371
Password: DMpm5tpZT42
Join by video system
Dial 23348977371@burlingtoncounty.webex.com You can also dial 173.243.2.68 and enter your meeting number. Join by phone +1-408-418-9388 United States Toll Access code: 233 489 77371 |
| Name | Division of Purchasing |
| Address |
49 Rancocas Road
Mount Holly, NJ 08060 USA |
| Phone | (609) 265-5012 |
| Fax | |
| File Name | Description | File Size | ||
|
||||
| Specifications - PROJECT #CPU-24-0079B.pdf (please login to view this document) | Enclosed are the terms, conditions, and specifications. | 10.45 MB | 315544 | 6602765 |
| APPENDIX D - Basis of Design Prints rev 4-8-25 - Project Drawings (CPU-24-0079B).pdf (please login to view this document) | Enclosed are the project drawings. | 3.62 MB | 315544 | 6602769 |

With GovernmentContracts, you can:
...Project ID: Title: Microbiological Wastewater Additives Addenda: 2 Release Date: 5/5/2026 Due Date...: ...
TownShip of Wayne
Bid Due: 6/09/2026
...New Dates for questions_0001-IMPROVEMENTS TO MELODY, MIDDLETON & ELKTON WASTEWATER PUMP STATIONS...
Township of Hamilton
Bid Due: 6/02/2026
...MOTORS - REPAIR AND REPLACEMENT AND INSTALLATION FOR A ONE (1) YEAR PERIOD ...
Passaic Valley Sewerage Commission
Bid Due: 6/23/2026
.... S340898-07 HAMILTON TOWNSHIP IMPROVEMENTS TO MELODY, MIDDLETON, AND ELKTON WASTEWATER PUMP STATIONS... ...
Township of Hamilton
Bid Due: 6/02/2026