| Location: | California |
|---|---|
| Posted: | Jan 23, 2025 |
| Due: | Mar 28, 2025 |
| Agency: | Marin County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The County of Marin is seeking proposals from qualified Professional Engineering consultants to prepare designs, produce construction documents, and provide bid and construction phase support for the replacement of the HVAC Chilled Water Plant components located in the Marin Civic Center, 3501 Civic Center Drive in San Rafael. The primary design discipline for this project is mechanical engineering, with support in the areas of electrical engineering, civil/structural engineering, and cost estimating/scheduling.
See Request for Proposals for Professional Engineering Services - Marin Civic Center HVAC Chilled Water Plant Replacement for full details.

With GovernmentContracts, you can:
...- 7777 bestmating@boboconstruction.com Dennis Basford 707- 332- 8200 estimating@welyons.com Teena...
San Mateo-Foster City School District
Bid Due: 6/04/2026
...architectural, engineering and/or cost estimating services. The Department intends to establish multiple...
Sacramento County Department of Airports
Bid Due: 7/07/2026
...enterprise resource planning tools (e.g., BERT budgeting, estimating, reporting and tracking: CHDS...
DEPT OF DEFENSE
Bid Due: 6/10/2026
...(Consultants) to provide on-call architectural, engineering and/or cost estimating services. The...
Sacramento County
Bid Due: 7/07/2026