| Location: | New Mexico |
|---|---|
| Posted: | Oct 16, 2024 |
| Due: | Nov 19, 2024 |
| Agency: | TRANSPORTATION, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 6982AF25B000001 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
PROJECT NUMBER: NM ERFO FS SNTFE 2022-1(1)
PROJECT NAME: EL PORVENIR BRIDGE
PROJECT DESCRIPTION: The purpose of this project is to replace the previous bridge which was destroyed in the Hermits Peak/ Calf Canyon fire in April 2022. The bridge is located in the Santa Fe National Forest, approximately 17-miles northwest of Las Vegas, NM.
The project is considered 4R and located in Mountainous terrain.
SCOPE OF THE WORK: The proposed improvements include a new bridge west of the previously destroyed structure. The replacement bridge is planned to be a prefabricated steel structure with a span of 97 feet and a width of 16 feet. The bridge will be founded on drilled shafts with a structural metal decking and reinforced concrete topper. In addition, the scope includes removal of an existing low water crossing, which is serving as a temporary diversion for traffic along the route, and obliteration of a portion of the existing road. Embankment work will be required for the realignment of the aggregate surfaced road.
| Oct 23, 2024 | [Solicitation (Updated)] NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge |
| Oct 30, 2024 | [Solicitation (Updated)] NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge |
| Nov 13, 2024 | [Solicitation (Updated)] NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge |
| Nov 21, 2024 | [Solicitation (Updated)] NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge |
| Nov 22, 2024 | [Solicitation (Updated)] NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge |
| Nov 26, 2024 | [Solicitation (Updated)] NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge |
| Jan 6, 2025 | [Solicitation (Updated)] NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge |

With GovernmentContracts, you can: