| Location: | South Carolina |
|---|---|
| Posted: | Aug 11, 2025 |
| Due: | Sep 5, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The scope of work will include the demolition of the metal building structure only, the foundation is to remain. Any bolt protrusions should be cut off flush with the concrete foundation. The contracted services are to include building demolition, removal, and disposal of the material.

With GovernmentContracts, you can:
...Branch to be a concrete slab structure capable of carrying heavy construction and ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/16/2026
...Section B project consists of combination of concrete pathway, retaining wall structure... and ...
Richland County
Bid Due: 6/16/2026
...with a 10'x10' metal roofed hip structure; 1,000 LF of 8' wide concrete ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/18/2026
...Bid Number: 2026-014 Bid Title: Construction Manager At-Risk for Abernathy Park Category...: Construction ...
City of Clemson
Bid Due: 6/30/2026